WELL · 42-325-33037 · DISTRICT 1

Boyce, Walter R. #1

N

Medina County  · Vertical

Boyce, Walter R. #1 (API 42-325-33037) is a permitted well in Medina County filed by Glover Oil, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 1,000 ft.

Completion filings report one formation top, including Escondido.

Operator of record

Glover Oil, Inc.

Pasadena, TX · P-5 Y, filed Sep 2, 2016 · 34 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGlover Oil, Inc.Dec 28, 1984
1,000
total depth, ft
2
permits on file
Dec 28, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
262878-99DrillGlover Oil, Inc.Dec 28, 1984Dec 28, 1984—1,000
223555-99DrillPecan Gap Oil & GasDec 8, 1983Dec 14, 1983—1,000

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Escondido523

Perforations

Perforated and open-hole intervals.

FromToType
523532Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55326.560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 1, 1985Mar 22, 1985—
00Mar 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32533037, documented in the API reference.