WELL · 42-327-30437 · DISTRICT 7
V.E. Rogers D #2
Menard County · Tuckmar S. (Strawn) field · Vertical
V.E. Rogers D #2 (API 42-327-30437) is a plugged well in Menard County, plugged April 18, 1995, last operated by Fisk Petroleum Corporation.
The RRC has issued 2 drilling permits between 1981 and 1985, permitted to 4,500 ft.
Completion filings report one formation top, including Crosscut.
Operator of record
Lewisville, TX · P-5 Y, filed Apr 5, 1999 · 12 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fisk Petroleum Corporation |
| Production reports | none |
| Latest permit | Fisk Petroleum CorporationMay 14, 1985 |
- 4,500
- total depth, ft
- 2
- permits on file
- May 14, 1985
- last permit issued
- Aug 3, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 1982
- Shut in
- —
- Plugged
- Apr 18, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walters, R. E. "D" O-9-11373 | Tuckmar, South (Cross Cut) | Morrow Resources, Inc. | 1 | 0 | 0 | Jan 1993 – Jun 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 275473-99 | Recompletion | Fisk Petroleum Corporation | Apr 24, 1985 | May 14, 1985 | — | 4,500 |
| 145631-99 | Drill | International Western Oil Corp. | Dec 29, 1981 | Dec 29, 1981 | Dec 10, 1981 | 4,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11373 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,236 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Crosscut | 3,335 | -1,099 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,335 | 3,340 | Perforated |
| 3,926 | 3,949 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 440 | 12.25 | 253 S |
| 2.375 | 3,914 | — | — |
| 4.5 | 4,002 | 7.875 | 600 S |
| 4.5 | 4,007 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 15, 1986 | Jul 2, 1986 | — |
| 00 | Jun 7, 1985 | Apr 25, 1985 | — |
| 00 | Jun 6, 1985 | — | — |
| 00 | Jan 12, 1984 | Mar 28, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-327-30437 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-327-30437 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 143K
- bbl, all reported
- May 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000057392 | W-14 Disposal | Plugged May 5, 1995 | 400 | 1,650 | 3,333–3,340 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32730437, documented in the API reference.