WELL · 42-327-30842 · DISTRICT 7
Hillert "A" #4A
Menard County · Vertical
Hillert "A" #4A (API 42-327-30842) is a plugged well in Menard County, plugged January 31, 1998, last operated by Cazar Energy Inc.
The RRC has issued 3 drilling permits (amended once) between 1997 and 2009, permitted to 2,600 ft.
Completion filings report 5 formation tops, including B/Home Creek, B/Home (Reef), T/Capps, T/Caddo.
Its 2 leases have reported 603 barrels of oil and 3.8K mcf of gas since December 2006, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Austin, TX · P-5 Y, filed Mar 4, 2026 · 16 permits on file · (512) 626-8750
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cazar Energy Incthrough Sep 2012 |
| Latest permit | Cazar Energy IncDec 15, 2009 |
- 2,600
- total depth, ft
- 4
- permits on file
- Dec 15, 2009
- last permit issued
- —
- completed
- 603
- cumulative oil, bbl
- 3.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 31, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hillert "A" O-9-17054 | Menard, W. (Harkey) | Cazar Energy Inc | 1 | 603 | 0 | Jan 2010 – Jul 2026 |
| Hillert "A" G-9-243659 | Las Moras (Caddo) | Cazar Energy Inc | 1 | 0 | 3.8K | Dec 2006 – Jan 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cazar Energy IncApr 2008 → Sep 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 688621-99 | Recompletion | Cazar Energy Inc | Dec 14, 2009 | Dec 15, 2009 | Nov 2, 2009 | 2,441 |
| 608042-98 | Reenter | Cazar Energy Inc | May 8, 2008 | Oct 19, 2005 | Nov 29, 2005 | 2,441 |
| 608042-99 | Reenter | Nordan Oil & Gas Corporation | Oct 17, 2005 | Oct 19, 2005 | Nov 29, 2005 | 2,441 |
| 469805-99 | Drill | Nordan Oil & Gas Corp. | Nov 7, 1997 | Nov 17, 1997 | Jan 26, 1998 | 2,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-243659 | — | — | — | — |
| — | — O-9-17054 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,109 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Home Creek | 1,693 | 416 |
| B/Home (Reef) | 1,693 | 416 |
| T/Capps | 2,179 | -70 |
| T/Caddo | 2,380 | -271 |
| T/Caddo (Goen) | 2,380 | -271 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,304 | 2,308 | Perforated |
| 2,390 | 2,396 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 279 | 11 | 160 S |
| 4.5 | 2,443 | 7.875 | 90 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 2010 | Jan 25, 2010 | Yes |
| 00 | Feb 2, 2010 | — | — |
| 00 | Jan 27, 2009 | Sep 2, 2008 | Yes |
| 00 | Jan 9, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-327-30842 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-327-30842 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.