WELL · 42-327-30960 · DISTRICT 7
Murr #2
Menard County · Wilhelm Lane W. (Strawn Upper) field · Vertical
Murr #2 (API 42-327-30960) is a plugged well in Menard County, plugged May 29, 2020, last operated by Cfo Resources Inc..
The RRC has issued one drilling permit, issued January 28, 2004, permitted to 3,400 ft.
It was permitted by Halvey Energy CO. and has since transferred to Cfo Resources Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including King Sand, Palo Pinto, Cross Cut Sand, Fry Sand.
Its lease has reported 12.8K barrels of oil and 10.1K mcf of gas since July 2003, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Halvey Energy Co.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed May 29, 2025 · (432) 853-4647
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cfo Resources Inc. |
| Production reports | Cfo Resources, Inc.through Sep 2016 |
| Latest permit | Halvey Energy Co.Jan 28, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Jan 28, 2004
- last permit issued
- Jun 15, 2004
- completed
- 12.8K
- cumulative oil, bbl
- 10.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 15, 2004
- Shut in
- —
- Plugged
- May 29, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Murr O-9-15426 | Wilhelm Lane, W. (Strawn, Upper) | Cfo Resources, Inc. | 2 | 12.8K | 10.1K | Jul 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Halvey Energy Co.Jul 2003 → Oct 2004
- 2Spi Operations LLCNov 2004 → Aug 2006
- 3Cfo Resources, Inc.Jun 2007 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 541138-99 | Drill | Halvey Energy Co. | Jan 23, 2004 | Jan 28, 2004 | Mar 9, 2004 | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-15426 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,243 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| King Sand | 2,010 | 233 |
| Palo Pinto | 3,015 | -772 |
| Cross Cut Sand | 3,100 | -857 |
| Fry Sand | 3,344 | -1,101 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,344 | 3,366 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 317 | 12.25 | 210 S |
| 4.5 | 3,440 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 25, 2004 | Jul 8, 2004 | Yes |
| 00 | Jul 22, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-327-30960 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-327-30960 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32730960, documented in the API reference.