WELL · 42-327-31128 · DISTRICT 7

Peggy #1

N

Menard County · Wildcat field  · Vertical

Peggy #1 (API 42-327-31128) is a well in Menard County operated by Sha-Jam Operating Corp., completed October 27, 2011.

The RRC has issued 2 drilling permits (amended once) between 2011 and 2015, permitted to 3,500 ft.

Completion filings report one formation top, including Ellenburger.

Its 2 leases have reported 51.3K barrels of oil and 4.97K mcf of gas since October 2011, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 185 barrels injected in the 12 months reported through April 2025.

Operator of record

Sha-Jam Operating Corp.

Midland, TX · P-5 Y, filed Dec 4, 2025 · 166 permits on file · (432) 559-8503

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSha-Jam Operating Corp.
Production reportsGolden Oil and Ranch, LLCthrough Feb 2026
Latest permitSha-Jam Operating Corp.Mar 12, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
3
permits on file
Mar 12, 2015
last permit issued
Oct 27, 2011
completed
51.3K
cumulative oil, bbl
4.97K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 27, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peggy O-9-18191John P (Ellenburger)Golden Oil and Ranch, LLC551.3K4.97KJan 2013 – Jul 2026
Peggy O-9-17693WildcatSha-Jam Operating Corp.100Oct 2011 – Apr 2015

Oil, barrels lease total

Last 12 months 322 · prior 12 1,136(-72%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 29 · prior 12 86(-66%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sha-Jam Operating Corp.Sep 2013 → Apr 2017
  2. 2Golden Oil and Ranch, LLCMay 2017 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804547-99RecompletionSha-Jam Operating Corp.Mar 11, 2015Mar 12, 2015Mar 3, 20153,500
721418-98DrillSha-Jam Operating Corp.Aug 4, 2011Aug 3, 2011Aug 17, 20113,500
721418-99DrillSha-Jam Operating Corp.Aug 1, 2011Aug 3, 2011Aug 17, 20113,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-17693————
—— O-9-18191————

Formation tops

As filed on W-2/G-1. Subsea from 2,327 ft elevation.Download CSV →

FormationMD ftSubsea
Ellenburger3,004-677

Perforations

Perforated and open-hole intervals.

FromToType
987998Perforated
2,6622,666Perforated
3,0063,038Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540211230 S
5.53,4877.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 2015Apr 6, 2015—
00Jan 11, 2013Dec 23, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

185
bbl, last 12 reported months
62.8K
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112109H-1 InjectionActive5,0001,5003,004–3,350

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 185 · prior 12 262(-29%)

05010020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.