WELL · 42-327-31137 · DISTRICT 7
Alda Davis #2
Menard County · John P (Ellenburger) field · Producing · Vertical
Alda Davis #2 (API 42-327-31137) is a well in Menard County operated by Geosurveys Inc., completed November 18, 2011 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 2011 and 2026, permitted to 3,500 ft.
Completion filings report 3 formation tops, including Top/Home Creek, Palo Pinto, Caddo.
Its lease has reported 80.2K barrels of oil since November 2011, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Apr 4, 2026 · 139 permits on file · (325) 669-2793
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Geosurveys Inc. |
| Production reports | Geosurveys, Inc.through Apr 2026 |
| Latest permit | Geosurveys, Inc.Jul 10, 2026 |
- 3,500
- total depth, ft
- 3
- permits on file
- Jul 10, 2026
- last permit issued
- Nov 18, 2011
- completed
- 80.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 18, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Alda Davis O-9-17985 | John P (Ellenburger) | Geosurveys, Inc. | 4 | 80.2K | 0 | Nov 2011 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,065 · prior 12 2,262(-9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Nordan Oil & Gas CorporationNov 2011 → Dec 2016
- 2Geosurveys, Inc.Jan 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 916842-99 | Recompletion | Geosurveys, Inc. | Jun 30, 2026 | Jul 10, 2026 | — | 3,018 |
| 725009-98 | Drill | Nordan Oil & Gas Corporation | May 28, 2013 | Sep 28, 2011 | Oct 14, 2011 | 3,500 |
| 725009-99 | Drill | Nordan Oil & Gas Corporation | Sep 26, 2011 | Sep 28, 2011 | Oct 14, 2011 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-17985 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,268 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top/Home Creek | 1,758 | 510 |
| Palo PintoTOP PALO PINTO | 2,420 | -152 |
| CaddoTOP CADDO (GOEN) | 2,896 | -628 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,970 | 2,976 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 347 | 11 | 220 S |
| 5.5 | 3,013 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 2013 | May 23, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-327-31137 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-327-31137 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32731137, documented in the API reference.