WELL · 42-327-31256 · DISTRICT 9

Terrell #1

Plugged

Menard County · Wildcat field  · Vertical

Terrell #1 (API 42-327-31256) is a plugged well in Menard County, plugged February 13, 2024, last operated by Live Oak Production LLC.

The RRC has issued one drilling permit, issued November 6, 2023, permitted to 2,400 ft.

It was permitted by Live Oak Production, LLC and has since transferred to Live Oak Production LLC on the wellbore schedule.

Operator of record

Live Oak Production LLC

Permitted by Live Oak Production, LLC; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLive Oak Production, LLCNov 6, 2023

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,400
total depth, ft
1
permits on file
Nov 6, 2023
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 13, 2024

Surface location

30.795894, -99.652806

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Menard County.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
895085-99DrillLive Oak Production, LLCNov 6, 2023Nov 6, 2023Feb 6, 20242,400

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32731256, documented in the API reference.