WELL · 42-329-00942 · DISTRICT 8
Lowe-J. E. Hill a/C 2 #3
Midland County · Clarence Scharbauer (Strawn) field · Vertical
Lowe-J. E. Hill A/C 2 #3 (API 42-329-00942) is a well in Midland County operated by Samson Hydrocarbons Company, completed June 10, 1987.
The RRC has issued 2 drilling permits between 1986 and 1994, permitted to 10,925 ft.
It was permitted by Samson Resources Company and has since transferred to Samson Hydrocarbons Company on the wellbore schedule.
Completion filings report 3 formation tops, including Anhy, Lime, Shale & Lime.
Its 2 leases have reported 91.4K barrels of oil and 158K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Samson Resources Company; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Y, filed Nov 7, 1997 · 28 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Samson Hydrocarbons Company |
| Production reports | Endeavor Energy Resources L.P.through Mar 2023 |
| Latest permit | Samson Resources CompanyAug 16, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,925
- total depth, ft
- 2
- permits on file
- Aug 16, 1994
- last permit issued
- Jun 10, 1987
- completed
- 91.4K
- cumulative oil, bbl
- 158K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 10, 1987
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lowe-Hill, J. E. O-10-2647 | HI-Lonesome (Wolfcamp) | Diamondback E&P LLC | 2 | 87.2K | 139K | Jan 1993 – Jul 2026 |
| Lowe-J. E. Hill a/C 2 O-10-615 | Clarence Scharbauer (Strawn) | Samson Hydrocarbons Company | 1 | 4.2K | 18.7K | Jan 1993 – Jun 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Resources CompanyJan 1993 → Mar 1995
- 2Samson Hydrocarbons CompanyApr 1995 → Aug 1995
- 3North Operating CompanyFeb 1996 → Nov 1997
- 4Stephens, Autry C.Jan 1998 → Aug 2000
- 5Endeavor Energy Resources L.P.Sep 2000 → Dec 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 426856-99 | Other | Samson Resources Company | Aug 11, 1994 | Aug 16, 1994 | Sep 12, 1994 | 10,925 |
| 324641-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Dec 22, 1986 | Dec 30, 1986 | — | 10,180 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-615 | — | — | — | — |
| — | — O-10-2647 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,812 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anhy | 1 | 2,811 |
| Lime | 4,560 | -1,748 |
| Shale & Lime | 9,320 | -6,508 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,380 | 10,392 | Perforated |
| 10,392 | 10,430 | Perforated |
| 10,440 | 10,470 | Perforated |
| — | 10,290 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 396 | — | — |
| 7.875 | 4,595 | — | — |
| 7.625 | 4,595 | — | — |
| 7.625 | — | — | 2,490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 1995 | Nov 8, 1994 | — |
| 00 | Dec 7, 1994 | — | — |
| 00 | Oct 22, 1987 | Sep 25, 1987 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-329-00942 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-329-00942 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32900942, documented in the API reference.