WELL · 42-329-31070 · DISTRICT 8

Capps SWD #1

WaterN

Midland County · Parks (Pennsylvanian) field  · Vertical

Capps Swd #1 (API 42-329-31070) is a well in Midland County operated by Xog Operating LLC, completed March 5, 2006.

The RRC has issued 2 drilling permits between 1982 and 2005, permitted to 10,800 ft.

Its 3 leases have reported 7.68K barrels of oil and 47.3K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.63K barrels injected in the 12 months reported through January 2026.

Operator of record

XOG Operating LLC

Midland, TX · P-5 Y, filed Oct 4, 2025 · 137 permits on file · (432) 425-0869

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXOG Operating LLC
Production reportsCox, John L.through Sep 2003
Latest permitXOG Operating LLCDec 2, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
2
permits on file
Dec 2, 2005
last permit issued
Mar 5, 2006
completed
7.68K
cumulative oil, bbl
47.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 2006
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Capps SWD O-10-40437Parks (Consolidated)Platform Operating, LLC100Apr 2009 – Jul 2026
Capps SWD O-10-38080Parks (Pennsylvanian)XOG Operating LLC100Mar 2006 – Feb 2011
Wisenteiner O-10-27445Parks (Pennsylvanian)JM Cox Resources, L.P.17.68K47.3KJan 1993 – Feb 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cox, John L.Jan 1993 → Aug 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
610390-99ReenterXOG Operating LLCDec 2, 2005Dec 2, 2005Feb 9, 20066,000
160345-99DrillCox, John L.May 10, 1982May 10, 1982—10,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-27445————
—— O-10-38080————
—— O-10-40437————

Perforations

Perforated and open-hole intervals.

FromToType
5,0455,075Perforated
10,46910,544Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7540017400 S
8.6254,701111,100 S
2.87510,210——
4.510,6157.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 22, 2011Mar 9, 2006—
00Jul 5, 2010Mar 9, 2006—
00May 22, 2007Nov 20, 2006—
00Apr 27, 2007——
00Jan 12, 1984Jul 1, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.63K
bbl, last 12 reported months
321K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096062W-14 DisposalActive2,0002,0004,500–5,120

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,634 · prior 12 41,278(-96%)

02K4K6K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32931070, documented in the API reference.