WELL · 42-329-31199 · DISTRICT 8
Koonce Evelyn #1
Midland County · Betty Sue (Strawn) field · Vertical
Koonce Evelyn #1 (API 42-329-31199) is a plugged well in Midland County, plugged October 29, 2012, last operated by Endeavor Energy Resources L.P..
The RRC has issued one drilling permit, issued August 19, 1983, permitted to 11,000 ft.
It was permitted by Wilson Energy, Inc./Lawless and has since transferred to Endeavor Energy Resources L.P. on the wellbore schedule.
Its lease has reported 654 barrels of oil and 1.72K mcf of gas since January 1993, last reporting in April 2014.
Operator of record
Endeavor Energy Resources L.P.
Permitted by Wilson Energy, Inc./Lawless; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Apr 4, 2026 · 6,190 permits on file · (855) 247-5920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Endeavor Energy Resources L.P. |
| Production reports | JMW Resources, Inc.through Sep 1993 |
| Latest permit | Wilson Energy, Inc./LawlessAug 19, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 1
- permits on file
- Aug 19, 1983
- last permit issued
- Oct 13, 1983
- completed
- 654
- cumulative oil, bbl
- 1.72K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 1983
- Shut in
- —
- Plugged
- Oct 29, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Koonce, Evelyn O-10-28494 | Betty Sue (Strawn) | Endeavor Energy Resources L.P. | 1 | 654 | 1.72K | Jan 1993 – Apr 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JMW Resources, Inc.Jan 1993 → May 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 206872-99 | Drill | Wilson Energy, Inc./Lawless | Aug 12, 1983 | Aug 19, 1983 | — | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-28494 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,571 | 10,596 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 300 | 17.5 | 350 S |
| 8.625 | 4,145 | 11 | 350 S |
| 2.375 | 10,343 | — | — |
| 4.5 | 10,750 | 7.875 | 1,100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 8, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-329-31199 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-329-31199 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 1997
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000084981 | W-14 Disposal | Plugged Nov 2, 2012 | 3,000 | 1,000 | 4,440–4,640 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32931199, documented in the API reference.