WELL · 42-329-32925 · DISTRICT 8
Mode #2
Midland County · Spraberry (Trend Area) field · Vertical
Mode #2 (API 42-329-32925) is a plugged well in Midland County, plugged March 22, 1996, last operated by Mwj Producing Company.
The RRC has issued one drilling permit, issued October 4, 1993, permitted to 9,000 ft.
Completion filings report 2 formation tops, including Spraberry, Dean.
Its lease has reported 13.8K barrels of oil and 21.5K mcf of gas since November 1993, last reporting in February 1997.
Operator of record
Midland, TX · P-5 Y, filed Apr 14, 2000 · 224 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MWJ Producing Company |
| Production reports | MWJ Producing Companythrough Jan 1996 |
| Latest permit | MWJ Producing CompanyOct 4, 1993 |
- 9,000
- total depth, ft
- 1
- permits on file
- Oct 4, 1993
- last permit issued
- Nov 16, 1993
- completed
- 13.8K
- cumulative oil, bbl
- 21.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1993 THROUGH Feb 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 16, 1993
- Shut in
- —
- Plugged
- Mar 22, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mode O-10-34025 | Spraberry (Trend Area) | MWJ Producing Company | 1 | 13.8K | 21.5K | Nov 1993 – Feb 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MWJ Producing CompanyNov 1993 → Jan 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416513-99 | Drill | MWJ Producing Company | Sep 28, 1993 | Oct 4, 1993 | Oct 21, 1993 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34025 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,658 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,289 | 7,446 | Perforated |
| 7,946 | 8,215 | Perforated |
| 8,669 | 8,876 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 365 | 17.5 | 350 S |
| 8.625 | 4,200 | 11 | 600 S |
| 5.5 | 9,000 | 7.875 | 1,100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 1994 | Dec 2, 1993 | Yes |
| 00 | Dec 13, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-329-32925 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-329-32925 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32932925, documented in the API reference.