WELL · 42-329-36833 · DISTRICT 8

Dora Roberts Ranch Unit #2910

Plugged

Midland County · Virey (Consolidated) field  · Vertical

Dora Roberts Ranch Unit #2910 (API 42-329-36833) is a plugged well in Midland County, plugged March 5, 2020, last operated by Oxy USA Wtp LP.

The RRC has issued one drilling permit, issued September 23, 2010, permitted to 11,000 ft.

Completion filings report 2 formation tops, including Strawn, Wolfcamp.

Its 2 leases have reported 11.6M barrels of oil and 48.5M mcf of gas since October 1995, last reporting in July 2026. The leases carry 318 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA WTP LP

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,289 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsContinental Resources, Inc.through Apr 2026
Latest permitOXY USA WTP LPSep 23, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Sep 23, 2010
last permit issued
Jan 7, 2011
completed
11.6M
cumulative oil, bbl
48.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 7, 2011
Shut in
—
Plugged
Mar 5, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 318 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dora Roberts Ranch Unit O-10-34635Dora Roberts (Consolidated)Continental Resources, Inc.2448.26M39.5MOct 1995 – Jul 2026
Dora Roberts Ranch Unit O-10-34646Virey (Consolidated)OXY USA WTP LP743.3M8.94MOct 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 137,463 · prior 12 179,155(-23%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 633,491 · prior 12 872,157(-27%)

050K100K150K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1OXY USA Inc.Oct 1995 → Dec 2000
  2. 2OXY USA WTP LPJan 2001 → Oct 2023
  3. 3Continental Resources, Inc.Nov 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
702539-99DrillOXY USA WTP LPSep 21, 2010Sep 23, 2010Nov 27, 201011,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-34635————
—— O-10-34646————

Formation tops

As filed on W-2/G-1. Subsea from 2,888 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn7,867-4,979
Wolfcamp9,122-6,234

Perforations

Perforated and open-hole intervals.

FromToType
7,88010,040Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,41012.25600 S
5.510,1958.751,290 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 20, 2019Jul 31, 2019—
00Oct 17, 2011Aug 22, 2011Yes
00Oct 14, 2011Aug 22, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112133H-1 InjectionPlugged Jun 29, 202010,0003,9347,867–10,100

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32936833, documented in the API reference.