WELL · 42-331-32721 · DISTRICT 1

Gunn #1

N

Milam County  · Vertical

Gunn #1 (API 42-331-32721) is a permitted well in Milam County filed by Petro Delta; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1984 and 2002, permitted to 2,500 ft.

Completion filings report one formation top, including Wilcox.

Its 2 leases have reported 16.4K barrels of oil and 140 mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Petro Delta

Rockdale, TX · P-5 Y, filed May 6, 2016 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBrazos Geological Consulting LTthrough Apr 2026
Latest permitPetro DeltaFeb 7, 2002
2,500
total depth, ft
3
permits on file
Feb 7, 2002
last permit issued
—
completed
16.4K
cumulative oil, bbl
140
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gunn O-1-14377Midway (2300 Oil)Brazos Geological Consulting LT214.9K0Dec 2001 – Jul 2026
Gunn O-1-10405Midway (2300)Comanche Well Service Corp.11.46K140Jan 1993 – Mar 2008

Oil, barrels lease total

Last 12 months 992 · prior 12 1,025(-3%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Water Works Engineering, Inc.Jan 1993 → May 1996
  2. 2Petro DeltaAug 1997 → Nov 2001
  3. 3Cole, Frank W EngineeringDec 2001 → Mar 2006
  4. 4Comanche Well Service Corp.Apr 2006 → Mar 2007
  5. 5Three Forks Operating Co, LLCAug 2012 → Sep 2017
  6. 6Sheldon Resources, L.P.Oct 2017 → Nov 2024
  7. 7Brazos Geological Consulting LTJan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
517097-99Field transferPetro DeltaJan 25, 2002Feb 7, 2002—2,500
263781-99DrillArledge, TerryJan 10, 1985Jan 9, 1985—2,500
258643-99DrillArledge, TerryJan 10, 1985Nov 26, 1984—2,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10405————
—— O-1-14377————

Formation tops

As filed on W-2/G-1. Subsea from 542 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox2,250-1,708

Perforations

Perforated and open-hole intervals.

FromToType
2,3702,375Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.52,5007.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2002Jan 28, 2002Yes
00May 8, 2002——
00Jun 5, 1985Apr 26, 1985—
00Jun 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33132721, documented in the API reference.