WELL · 42-331-32721 · DISTRICT 1
Gunn #1
Milam County · Vertical
Gunn #1 (API 42-331-32721) is a permitted well in Milam County filed by Petro Delta; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 2002, permitted to 2,500 ft.
Completion filings report one formation top, including Wilcox.
Its 2 leases have reported 16.4K barrels of oil and 140 mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Rockdale, TX · P-5 Y, filed May 6, 2016 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Brazos Geological Consulting LTthrough Apr 2026 |
| Latest permit | Petro DeltaFeb 7, 2002 |
- 2,500
- total depth, ft
- 3
- permits on file
- Feb 7, 2002
- last permit issued
- —
- completed
- 16.4K
- cumulative oil, bbl
- 140
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gunn O-1-14377 | Midway (2300 Oil) | Brazos Geological Consulting LT | 2 | 14.9K | 0 | Dec 2001 – Jul 2026 |
| Gunn O-1-10405 | Midway (2300) | Comanche Well Service Corp. | 1 | 1.46K | 140 | Jan 1993 – Mar 2008 |
Oil, barrels lease total
Last 12 months 992 · prior 12 1,025(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Water Works Engineering, Inc.Jan 1993 → May 1996
- 2Petro DeltaAug 1997 → Nov 2001
- 3Cole, Frank W EngineeringDec 2001 → Mar 2006
- 4Comanche Well Service Corp.Apr 2006 → Mar 2007
- 5Three Forks Operating Co, LLCAug 2012 → Sep 2017
- 6Sheldon Resources, L.P.Oct 2017 → Nov 2024
- 7Brazos Geological Consulting LTJan 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 517097-99 | Field transfer | Petro Delta | Jan 25, 2002 | Feb 7, 2002 | — | 2,500 |
| 263781-99 | Drill | Arledge, Terry | Jan 10, 1985 | Jan 9, 1985 | — | 2,500 |
| 258643-99 | Drill | Arledge, Terry | Jan 10, 1985 | Nov 26, 1984 | — | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-10405 | — | — | — | — |
| — | — O-1-14377 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 542 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 2,250 | -1,708 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,370 | 2,375 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 2,500 | 7.875 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 2002 | Jan 28, 2002 | Yes |
| 00 | May 8, 2002 | — | — |
| 00 | Jun 5, 1985 | Apr 26, 1985 | — |
| 00 | Jun 1, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-331-32721 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-331-32721 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33132721, documented in the API reference.