WELL · 42-331-33933 · DISTRICT 1
Menke #1
Milam County · Minerva-Rockdale field · NO Production · Vertical
Menke #1 (API 42-331-33933) is a well in Milam County operated by Viejo Services LLC, completed April 12, 2012 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued October 12, 2011, permitted to 1,500 ft.
It was permitted by Goforth Production Company and has since transferred to Viejo Services LLC on the wellbore schedule.
Completion filings report one formation top, including Navarro.
Its lease has reported 1.61K barrels of oil since April 2012, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Goforth Production Company; the EWA schedule now lists a different operator.
Boyd, TX · P-5 Y, filed Jul 4, 2026 · 2 permits on file · (940) 452-8284
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Viejo Services LLC |
| Production reports | Viejo Services, LLCthrough Jun 2022 |
| Latest permit | Goforth Production CompanyOct 12, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,500
- total depth, ft
- 1
- permits on file
- Oct 12, 2011
- last permit issued
- Apr 12, 2012
- completed
- 1.61K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 12, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Menke O-1-16932 | Minerva-Rockdale | Viejo Services, LLC | 5 | 1.61K | 0 | Apr 2012 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goforth Production CompanyApr 2012 → Aug 2013
- 294 Operating, LPSep 2013 → May 2014
- 32014 GS Holdings Operating, LLCAug 2014 → Jan 2019
- 4Fullspike Energy LLCFeb 2019 → Aug 2019
- 5Rwa, LLCSep 2019 → Apr 2022
- 6Viejo Services, LLCMay 2022 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 726006-99 | Drill | Goforth Production Company | Oct 10, 2011 | Oct 12, 2011 | Oct 12, 2011 | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-16932 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,168 | 1,182 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,296 | 6.75 | 140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 22, 2013 | Jul 10, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-331-33933 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-331-33933 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33133933, documented in the API reference.