WELL · 42-331-34192 · DISTRICT 3

Cunningham Unit #3

N

Milam County · Giddings (Austin Chalk-3) field  · Horizontal

Cunningham Unit #3 (API 42-331-34192) is a horizontal well in Milam County operated by Lrr Pecos Valley LLC, completed June 26, 2012.

The RRC has issued 2 drilling permits between 2012 and 2017, permitted to 12,000 ft.

It was permitted by Treadstone Energy Prtnr OP, LLC and has since transferred to Lrr Pecos Valley LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Top B-Zone, Top Ash Marker.

Its 2 leases have reported 6.04K barrels of oil and 18K mcf of gas since June 2012, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

LRR Pecos Valley LLC

Permitted by Treadstone Energy Prtnr OP, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 4, 2026 · 48 permits on file · (713) 292-9555

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLRR Pecos Valley LLC
Production reportsTreadstone Energy Prtnr OP, LLCthrough Apr 2017
Latest permitTreadstone Energy Prtnr OP, LLCMar 1, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Mar 1, 2017
last permit issued
Jun 26, 2012
completed
6.04K
cumulative oil, bbl
18K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cunningham O-3-27320Giddings (Pecan Gap)Magnolia Oil & Gas Operating LLC100Jun 2017 – Jul 2026
Cunningham Unit O-3-26075Giddings (Austin Chalk-3)LRR Pecos Valley, LLC16.04K18KJun 2012 – Oct 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPAug 2012 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Feb 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823589-99RecompletionTreadstone Energy Prtnr OP, LLCFeb 22, 2017Mar 1, 2017—6,004
735911-99DrillAnadarko E&P Company LPMar 12, 2012Mar 23, 2012Apr 16, 201212,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26075————
—— O-3-27320————

Formation tops

As filed on W-2/G-1. Subsea from 366 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap4,539-4,173
Austin ChalkTOP AUSTIN CHALK5,761-5,395
Top B-Zone5,892-5,526
Top Ash Marker5,904-5,538

Perforations

Perforated and open-hole intervals.

FromToType
4,5504,725Perforated
5,9776,850Perforated
5,97710,822Perforated
5,97711,861Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,27513.21,335 S
10.753,27513.51,335 S
7.6255,9779.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 2018Nov 17, 2017—
00Apr 18, 2013Aug 21, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33134192, documented in the API reference.