WELL · 42-331-34207 · DISTRICT 1

Noack Farms #A 1

Y

Milam County · Minerva-Rockdale field · Producing  · Vertical

Noack Farms #A 1 (API 42-331-34207) is a well in Milam County operated by Mojo Exploration & Production L, completed August 8, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 16, 2012, permitted to 1,999 ft.

It was permitted by Kingman Operating Company, Inc. and has since transferred to Mojo Exploration & Production L on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Navarro.

Its lease has reported 34.5K barrels of oil since August 2012, last reporting in July 2026. The lease carries 15 wells, so these are lease totals, not this well alone.

Operator of record

Mojo Exploration & Production L

Permitted by Kingman Operating Company, Inc.; the EWA schedule now lists a different operator.

Rockdale, TX · P-5 Y, filed Apr 4, 2026 · (512) 566-3456

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMojo Exploration & Production L
Production reportsMojo Exploration & Production, Lthrough Feb 2026
Latest permitKingman Operating Company, Inc.Apr 16, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Apr 16, 2012
last permit issued
Aug 8, 2012
completed
34.5K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 8, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Noack Farms O-1-16355Minerva-RockdaleMojo Exploration & Production, L1534.5K0Aug 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 208 · prior 12 362(-43%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kingman Operating Company, Inc.Aug 2012 → Jan 2013
  2. 2Rto Operating, LLCFeb 2013 → Jun 2013
  3. 3Rockdale Resources CorporationJul 2013 → Jul 2016
  4. 4Petrolia Energy CorporationAug 2016 → Aug 2019
  5. 5Whitehead Resources, Ltd.Sep 2019 → Feb 2024
  6. 6Tesuque Oil & Gas LLCMar 2024 → Nov 2024
  7. 7Mojo Exploration & Production, LDec 2024 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
737229-99DrillKingman Operating Company, Inc.Mar 29, 2012Apr 16, 2012Jun 21, 20121,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16355————

Formation tops

As filed on W-2/G-1. Subsea from 452 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox1,250-798
NavarroNAVARRO A1,430-978
NavarroNAVARRO B1,667-1,215

Perforations

Perforated and open-hole intervals.

FromToType
1,6671,691Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,7907.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2013Aug 29, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33134207, documented in the API reference.