WELL · 42-331-34935 · DISTRICT 1

Elman #1

Plugged

Milam County · Minerva-Rockdale field  · Vertical

Elman #1 (API 42-331-34935) is a plugged well in Milam County, plugged April 3, 2023, last operated by Red Oak Oil Company LLC.

The RRC has issued one drilling permit, issued January 13, 2015, permitted to 1,700 ft.

It was permitted by Winchester Oil & Gas LLC and has since transferred to Red Oak Oil Company LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Navarro, Edwards.

Its lease has reported 193 barrels of oil since January 2015, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Red Oak Oil Company LLC

Permitted by Winchester Oil & Gas LLC; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 5, 2024 · (713) 705-1748

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRed Oak Oil Company LLC
Production reportsAB Reserve, LLCthrough Nov 2018
Latest permitWinchester Oil & Gas LLCJan 13, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,700
total depth, ft
1
permits on file
Jan 13, 2015
last permit issued
Feb 16, 2017
completed
193
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 16, 2017
Shut in
—
Plugged
Apr 3, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Elman O-1-18679Minerva-RockdaleRed Oak Oil Company, LLC31930Jan 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1AB Reserve, LLCFeb 2015 → Nov 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
802681-99DrillWinchester Oil & Gas LLCJan 12, 2015Jan 13, 2015Feb 3, 20151,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-18679————

Formation tops

As filed on W-2/G-1. Subsea from 423 ft elevation.Download CSV →

FormationMD ftSubsea
NavarroNAVARRO A1,487-1,064
NavarroNAVARRO - DISPOSAL1,487-1,064
EdwardsEDWARDS - DISPOSAL1,610-1,187
NavarroNAVARRO B1,610-1,187
EdwardsEDWARDS - DISPOSAL——
NavarroNAVARRO - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
1,4871,488Perforated
1,4871,656Perforated
1,6101,628Perforated
1,6441,656Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,7206.75210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 23, 2020Apr 1, 2020—
00Mar 31, 2017Mar 30, 2017—
00Sep 7, 2016Jun 16, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
618
bbl, all reported
Jul 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114907H-1 InjectionPlugged Apr 18, 20236007401,487–1,656

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 242(-100%)

05010015020202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33134935, documented in the API reference.