WELL · 42-331-34989 · DISTRICT 1

Jutson Arva Lee A-1 #A 3

Y

Milam County · Minerva-Rockdale field · Injection  · Vertical

Jutson Arva Lee A-1 #A 3 (API 42-331-34989) is a well in Milam County operated by Dorado Offshore LLC, completed July 30, 2019 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 21, 2017, permitted to 1,100 ft.

Completion filings report 4 formation tops, including Wilcox, Navaro A, Navarro, Edwards.

Its lease has reported 6.22K barrels of oil and 38 mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 2.2K barrels injected in the 12 months reported through July 2021.

Operator of record

Dorado Offshore LLC

Katy, TX · P-5 Y, filed Jun 4, 2026 · 12 permits on file · (832) 651-8168

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDorado Offshore LLC
Production reportsDorado Offshore, LLCthrough May 2022
Latest permitDorado Offshore, LLCMar 21, 2017
1,100
total depth, ft
1
permits on file
Mar 21, 2017
last permit issued
Jul 30, 2019
completed
6.22K
cumulative oil, bbl
38
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 30, 2019
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jutson, Arva Lee A-1 O-1-9579Minerva-RockdaleDorado Offshore, LLC106.22K38Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Freeman Corporation, TheJan 1993 → May 1996
  2. 2Oxford Oil Co.Jul 1996 → Aug 2004
  3. 3Schneider, ErnestSep 2004 → May 2012
  4. 4Price Operating, LLCJun 2012 → Dec 2015
  5. 5Dorado Offshore, LLCOct 2016 → May 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824255-99DrillDorado Offshore, LLCMar 8, 2017Mar 21, 2017Apr 28, 20171,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-9579————

Formation tops

As filed on W-2/G-1. Subsea from 470 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox780-310
Navaro A1,020-550
NavarroNAVARRO A1,020-550
EdwardsEDWARDS - DISPOSAL1,100-630
EdwardsEDWARDS - DISPOSAL1,110-640
NavarroNAVARRO - DISPOSAL1,110-640

Perforations

Perforated and open-hole intervals.

FromToType
1,0641,078Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1107.875243 S
4.51,1107.9309 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 1, 2020Aug 26, 2019Yes
00Jun 21, 2019May 2, 2019Yes
00Dec 19, 2018Sep 7, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.2K
bbl, last 12 reported months
4.35K
bbl, all reported
Jul 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118825H-1 InjectionActive2005301,064–1,078

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,195 · prior 12 2,154(+2%)

020040020202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33134989, documented in the API reference.