WELL · 42-335-01631 · DISTRICT 8
Hamilton W. L. #2
Mitchell County · Sharon Ridge (1700) field · Vertical
Hamilton W. L. #2 (API 42-335-01631) is a plugged well in Mitchell County, plugged September 15, 1992, last operated by T & M Oil Company.
The RRC has issued one drilling permit, issued July 28, 1997, permitted to 1,610 ft.
It was permitted by Phoenix Oil and has since transferred to T & M Oil Company on the wellbore schedule.
Its 2 leases have reported 16K barrels of oil since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Phoenix Oil; the EWA schedule now lists a different operator.
Plainview, TX · P-5 Y, filed Aug 4, 2006 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | T & M Oil Company |
| Production reports | Morgan Creek Production Co., Incthrough Jul 2020 |
| Latest permit | Phoenix OilJul 28, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,610
- total depth, ft
- 1
- permits on file
- Jul 28, 1997
- last permit issued
- —
- completed
- 16K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 15, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hamilton, W.L. O-11-67797 | Sharon Ridge (1700) | Morgan Creek Production Co., Inc | 2 | 16K | 0 | Sep 1997 – Jul 2026 |
| Hamilton, W. L. O-11-15067 | Sharon Ridge (1700) | T & M Oil Company | 2 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Phoenix OilSep 1997 → Oct 1997
- 2Phoenix Crude Oil CompanyNov 1997 → Oct 2004
- 3Morgan Creek Production Co., IncNov 2004 → Jul 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 465509-99 | Reenter | Phoenix Oil | Jul 28, 1997 | Jul 28, 1997 | — | 1,610 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-15067 | — | — | — | — |
| — | — O-11-67797 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,546 | 1,580 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 226 | — | — |
| 8.625 | 320 | — | — |
| 2 | 1,456 | — | — |
| 4.5 | 1,590 | — | — |
| 5.5 | 1,606 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 7, 1997 | Sep 15, 1997 | Yes |
| 00 | Oct 23, 1997 | — | — |
| 00 | Jan 12, 1984 | Jul 8, 1960 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-335-01631 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-335-01631 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33501631, documented in the API reference.