WELL · 42-335-31734 · DISTRICT 8
Collins #6
Mitchell County · Howard Glasscock (Consolidated) field · Vertical
Collins #6 (API 42-335-31734) is a plugged well in Mitchell County, plugged March 9, 2026, last operated by B. B. & C..
The RRC has issued one drilling permit, issued May 29, 1980, permitted to 1,400 ft.
It was permitted by Guthrie, A. K. Operating CO. and has since transferred to B. B. & C. on the wellbore schedule.
Its 2 leases have reported 9.98K barrels of oil and 9 mcf of gas since January 1993, last reporting in July 2026. The leases carry 16 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Guthrie, A. K. Operating Co.; the EWA schedule now lists a different operator.
Big Spring, TX · P-5 Y, filed Feb 4, 2026 · (432) 213-0500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | B. B. & C. |
| Production reports | B. B. & C.through Nov 2016 |
| Latest permit | Guthrie, A. K. Operating Co.May 29, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,400
- total depth, ft
- 1
- permits on file
- May 29, 1980
- last permit issued
- Oct 10, 1980
- completed
- 9.98K
- cumulative oil, bbl
- 9
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 1980
- Shut in
- —
- Plugged
- Mar 9, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Collins O-10-41287 | Howard Glasscock (Consolidated) | B. B. & C. | 8 | 1.22K | 0 | Dec 2011 – Jul 2026 |
| Collins O-10-23855 | Howard Glasscock | B. B. & C. | 8 | 8.77K | 9 | Jan 1993 – Nov 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Guthrie, Will W.Jan 1993 → May 1993
- 2Burcham, L. R.Aug 1996 → Oct 1999
- 3B. B. & C.Nov 1999 → Nov 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 82307-99 | Drill | Guthrie, A. K. Operating Co. | May 29, 1980 | May 29, 1980 | — | 1,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-23855 | — | — | — | — |
| — | — O-10-41287 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,259 | 1,282 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 1,265 | — | — |
| 4.5 | 1,320 | 6.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 2012 | Oct 20, 1980 | — |
| 00 | Jan 12, 1984 | Oct 20, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-335-31734 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-335-31734 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33531734, documented in the API reference.