WELL · 42-335-32528 · DISTRICT 8

Westbrook Southwest Unit #234

Y

Mitchell County · Westbrook field · Shut IN  · Vertical

Westbrook Southwest Unit #234 (API 42-335-32528) is a well in Mitchell County operated by Grayrock Energy II LLC, completed March 30, 2020 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 8, 1983, permitted to 3,400 ft.

It was permitted by Union Texas Petroleum Corp. and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including San Andres, San Angelo, Clear Fork.

Its lease has reported 8.65M barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 371 wells, so these are lease totals, not this well alone.

Operator of record

Grayrock Energy II LLC

Permitted by Union Texas Petroleum Corp.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsGrayrock Energy II, LLCthrough Apr 2026
Latest permitUnion Texas Petroleum Corp.Jun 8, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,400
total depth, ft
1
permits on file
Jun 8, 1983
last permit issued
Mar 30, 2020
completed
8.65M
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 30, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 371 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Westbrook Southwest Unit O-10-21120WestbrookGrayrock Energy II, LLC3718.65M21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 130,319 · prior 12 134,739(-3%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Inc.Jan 1993 → Jul 1996
  2. 2Burlington Resources Oil&gas Co.Aug 1996 → Apr 1997
  3. 3Gruy Petroleum Management Co.May 1997 → Apr 2006
  4. 4Cimarex Energy Co. of ColoradoMay 2006 → Sep 2009
  5. 5Merit Energy CompanyOct 2009 → May 2017
  6. 6Rover Petroleum Operating, LLCJun 2017 → Dec 2023
  7. 7Grayrock Energy II, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
198587-99DrillUnion Texas Petroleum Corp.Jun 8, 1983Jun 8, 1983—3,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-21120————

Formation tops

As filed on W-2/G-1. Subsea from 2,195 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres1,626569
San Angelo2,270-75
Clear ForkCLEARFORK2,508-313

Perforations

Perforated and open-hole intervals.

FromToType
2,7183,343Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62534012.25300 S
2.8753,130——
5.53,4007.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 28, 2020Apr 24, 2020—
00Jan 12, 1984Aug 25, 1983Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33532528, documented in the API reference.