WELL · 42-335-32747 · DISTRICT 8
Mills #6
Mitchell County · Sharon Ridge (1700) field · Vertical
Mills #6 (API 42-335-32747) is a well in Mitchell County operated by Schlachter Operating Corporation, completed July 24, 1984.
The RRC has issued one drilling permit, issued June 5, 1984, permitted to 1,790 ft.
It was permitted by Staley Oil Company and has since transferred to Schlachter Operating Corporation on the wellbore schedule.
Its 2 leases have reported 996K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 117 wells, so these are lease totals, not this well alone.
Operator of record
Schlachter Operating Corporation
Permitted by Staley Oil Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jul 4, 2026 · 65 permits on file · (214) 663-0270
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Schlachter Operating Corporation |
| Production reports | Schlachter Operating Corporationthrough Apr 2026 |
| Latest permit | Staley Oil CompanyJun 5, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,790
- total depth, ft
- 1
- permits on file
- Jun 5, 1984
- last permit issued
- Jul 24, 1984
- completed
- 996K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 117 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crawford-Strain Unit O-11-68448 | Sharon Ridge (1700) | Schlachter Operating Corporation | 112 | 956K | 0 | Aug 2002 – Jul 2026 |
| Mills O-11-5793 | Sharon Ridge (1700) | Schlachter Operating Corporation | 5 | 40K | 21 | Jan 1993 – Nov 2002 |
Oil, barrels lease total
Last 12 months 31,268 · prior 12 29,224(+7%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Staley Oil CompanyJan 1993 → Oct 1999
- 2Schlachter, David A., Estate OFNov 1999 → Jan 2000
- 3Schlachter Operating CorporationFeb 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 241146-99 | Drill | Staley Oil Company | Jun 4, 1984 | Jun 5, 1984 | Jun 22, 1984 | 1,790 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-5793 | — | — | — | — |
| — | — O-11-68448 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,646 | 1,719 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 556 | 12.25 | 350 S |
| 5.5 | 1,813 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 5, 2002 | Sep 24, 1984 | — |
| 00 | Oct 15, 1984 | Sep 24, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-335-32747 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-335-32747 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33532747, documented in the API reference.