WELL · 42-337-20099 · DISTRICT 9
Garlington #5
Montague County · Montague County Regular field · Vertical
Garlington #5 (API 42-337-20099) is a permitted well in Montague County filed by Stephens & Johnson Operating CO.; no completion report is on file yet.
The RRC has issued one drilling permit, issued August 16, 2016, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Palo Pinto, Bryson.
Its 2 leases have reported 8.41K barrels of oil and 12.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Stephens & Johnson Operating Co.
Wichita Falls, TX · P-5 X, filed Jul 2, 2026 · 360 permits on file · (940) 723-2166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stephens & Johnson Operating Co. |
| Production reports | Stephens & Johnson Operating Co.through Apr 2026 |
| Latest permit | Stephens & Johnson Operating Co.Aug 16, 2016 |
- 4,900
- total depth, ft
- 1
- permits on file
- Aug 16, 2016
- last permit issued
- —
- completed
- 8.41K
- cumulative oil, bbl
- 12.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garlington G-13-280867 | Montague County Reg. (Gas) | Stephens & Johnson Operating Co. | 1 | 0 | 12.5K | Aug 2016 – Jul 2026 |
| Garlington O-13-15181 | Montague County Regular | Stephens & Johnson Operating Co. | 3 | 8.41K | 358 | Jan 1993 – Dec 2018 |
Gas, mcf lease total
Last 12 months 2,035 · prior 12 1,627(+25%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephens & Johnson Operating Co.Aug 1995 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 817484-99 | Reclass | Stephens & Johnson Operating Co. | Aug 3, 2016 | Aug 16, 2016 | Aug 1, 2016 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-280867 | — | — | — | — |
| — | — O-13-15181 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 993 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 1,778 | -785 |
| BrysonBRYSON SAND | 4,674 | -3,681 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,675 | 4,692 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 117 | 12.25 | 85 S |
| 4.5 | 789 | 7.875 | 165 S |
| 4.5 | 4,873 | 7.875 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 2016 | Sep 8, 2016 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-20099 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-20099 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33720099, documented in the API reference.