WELL · 42-337-31134 · DISTRICT 9

Custers, Ruby F. "B" #4

N

Montague County  · Vertical

Custers, Ruby F. "B" #4 (API 42-337-31134) is a disposal or injection well in Montague County operated by Continental Oil Company under an active UIC permit.

The RRC has issued 2 drilling permits in 1978, permitted to 3,950 ft.

Completion filings report 2 formation tops, including Davenport, Granite Wash.

Its lease has reported 21.3K barrels of oil and 33 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 45.4K barrels injected in the 12 months reported through July 2025.

Operator of record

Continental Oil Company

Unknown, XX · P-5 Y · 624 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPeba Oil & Gas, Inc.through Apr 2026
Latest permitContinental Oil CompanyNov 1, 1978
3,950
total depth, ft
2
permits on file
Nov 1, 1978
last permit issued
—
completed
21.3K
cumulative oil, bbl
33
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Custers, Ruby F. -B- O-13-16140Bowers (Granite Wash)Peba Oil & Gas, Inc.521.3K33Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 162 · prior 12 150(+8%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wiser Oil Company, TheJan 1993 → Nov 1994
  2. 2Southwest Royalties, Inc.Dec 1994 → Feb 1995
  3. 3Swanson, Tommy Oil Co.Jul 1995 → Sep 1999
  4. 4Swanson, Tommy Oil Co., Inc.Oct 1999 → Jun 2003
  5. 5Peba Oil & Gas Co.Jul 2003 → Apr 2011
  6. 6Peba Oil & Gas, Inc.May 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
38498-99DrillContinental Oil CompanyNov 1, 1978Nov 1, 1978Nov 8, 19783,950
32383-99DrillContinental Oil CompanySep 11, 1978Sep 11, 1978Nov 8, 19783,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-16140————

Formation tops

As filed on W-2/G-1. Subsea from 934 ft elevation.Download CSV →

FormationMD ftSubsea
Davenport1,858-924
Granite Wash3,634-2,700

Perforations

Perforated and open-hole intervals.

FromToType
3,6363,704Perforated
—3,646Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551112.25300 S
5.53,8377.875675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 3, 1991Mar 25, 1991—
00Jan 12, 1984Dec 11, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

45.4K
bbl, last 12 reported months
1.39M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000073620H-1 InjectionActive1,5001,5003,630–3,720

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 45,400 · prior 12 47,050(-4%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33731134, documented in the API reference.