WELL · 42-337-31588 · DISTRICT 13

Templeton "A" #1

Plugged

Montague County  · Vertical

Templeton "A" #1 (API 42-337-31588) is a plugged well in Montague County, plugged October 30, 1983, last operated by Felderhoff Production CO..

The RRC has issued 2 drilling permits between 1981 and 1983, permitted to 6,500 ft.

Operator of record

Felderhoff Production Co.

Muenster, TX · P-5 Y, filed Jan 4, 2026 · 468 permits on file · (940) 768-9791

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitFelderhoff Production Co.Oct 7, 1983
6,500
total depth, ft
2
permits on file
Oct 7, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 30, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
216876-99OtherFelderhoff Production Co.Oct 7, 1983Oct 7, 1983—6,500
109603-99DrillBaron Co., TheFeb 25, 1981Feb 25, 1981—1,874

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33731588, documented in the API reference.