WELL · 42-337-32039 · DISTRICT 9
McConnell #1
Montague County · Vertical
Mcconnell #1 (API 42-337-32039) is a plugged well in Montague County, plugged December 11, 1984, last operated by L&R Tank Trucks.
The RRC has issued 2 drilling permits between 1982 and 2006, permitted to 6,250 ft.
Completion filings report 3 formation tops, including Thomas Sand, Gunsight, Strawn.
It holds an active disposal or injection permit, with 548K barrels injected in the 12 months reported through July 2025.
Operator of record
Bowie, TX · P-5 Y, filed Mar 4, 2026 · 6 permits on file · (940) 872-5319
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | L&R Tank TrucksJan 12, 2006 |
- 6,250
- total depth, ft
- 2
- permits on file
- Jan 12, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 11, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McConnell O-13-30595 | Sunset (Conglomerate) | Hess, Jerry Operating Co. | 1 | 0 | 0 | Apr 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612260-99 | Reenter | L&R Tank Trucks | Jan 11, 2006 | Jan 12, 2006 | Mar 6, 2006 | 6,050 |
| 183622-99 | Drill | Taylor Oper. Co. | Dec 31, 1982 | Dec 31, 1982 | Dec 6, 1983 | 6,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30595 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 928 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas Sand | 1,090 | -162 |
| GunsightGUNSIGHT SAND | 1,160 | -232 |
| StrawnSTRAWN SAND | 1,625 | -697 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,851 | 2,923 | Perforated |
| 2,851 | 3,360 | Perforated |
| 2,934 | 3,010 | Perforated |
| 3,200 | 3,312 | Perforated |
| 3,340 | 3,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 676 | 12.25 | 475 S |
| 5.5 | 3,533 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 9, 2026 | Jan 22, 2026 | — |
| 00 | Sep 28, 2006 | Apr 14, 2006 | — |
| 00 | May 16, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-32039 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-32039 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 548K
- bbl, last 12 reported months
- 12.9M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000095567 | W-14 Disposal | Active | 5,000 | 1,425 | 2,850–3,360 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 547,812 · prior 12 504,564(+9%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33732039, documented in the API reference.