WELL · 42-337-32147 · DISTRICT 9

Bonnie C. Cowden A #2

N

Montague County · Milam NE. (Strawn 5300) field  · Vertical

Bonnie C. Cowden A #2 (API 42-337-32147) is a well in Montague County operated by Myers W. K., completed March 17, 1984.

The RRC has issued 3 drilling permits between 1983 and 1984, permitted to 6,000 ft.

Completion filings report 3 formation tops, including Brazos River Sand, Strawn, Caddo.

Its lease has reported 20.2K barrels of oil and 10.9K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 49.3K barrels injected in the 12 months reported through July 2025.

Operator of record

Myers W. K.

Denton, TX · P-5 Y, filed May 7, 1993 · 7 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMyers W. K.
Production reportsLamar Energythrough Aug 2021
Latest permitMyers, W. K.Aug 23, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
3
permits on file
Aug 23, 1984
last permit issued
Mar 17, 1984
completed
20.2K
cumulative oil, bbl
10.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 17, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cowden, Bonnie C. "A" O-13-23324Milam, NE. (Caddo Conglomerate)Lamar Energy420.2K10.9KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Allen, C. L. (Doie)Mar 1994 → Sep 2002
  2. 2Duke, M.A. "Andy", Jr.Oct 2002 → Nov 2012
  3. 3Dyemon Oil & GasAug 2006 → Feb 2010
  4. 4Lamar EnergyApr 2014 → Aug 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
249476-99RecompletionMyers, W. K.Aug 20, 1984Aug 23, 1984—4,300
232290-99RecompletionMyers, W. K.Mar 5, 1984Mar 13, 1984—5,624
211588-99DrillMyers, W. K.Aug 25, 1983Sep 9, 1983Sep 18, 19836,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-23324————

Formation tops

As filed on W-2/G-1. Subsea from 810 ft elevation.Download CSV →

FormationMD ftSubsea
Brazos River Sand4,250-3,440
StrawnSTRAWN SAND5,292-4,482
CaddoCADDO LIMESTONE5,469-4,659
CaddoCADDO CONGL5,477-4,667

Perforations

Perforated and open-hole intervals.

FromToType
4,1804,230Perforated
5,2945,310Perforated
5,4845,496Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581412.25540 S
2.3755,450——
4.55,6207.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 1984Oct 19, 1984—
00May 4, 1984Apr 3, 1984—
00Apr 15, 1984Apr 3, 1984—
00Jan 12, 1984Oct 11, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

49.3K
bbl, last 12 reported months
2.32M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000053606W-14 DisposalActive3001,3004,180–4,230

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 49,270 · prior 12 49,840(-1%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33732147, documented in the API reference.