WELL · 42-337-32229 · DISTRICT 9
Sanders Jess C #3
Montague County · Sanders (Conglomerate Lo.) field · Producing · Vertical
Sanders Jess C #3 (API 42-337-32229) is a well in Montague County operated by O Neal Oil Company, completed January 5, 1984 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 24, 1983, permitted to 6,800 ft.
It was permitted by O'Neal, Lindell and has since transferred to O Neal Oil Company on the wellbore schedule.
Completion filings report 2 formation tops, including Twin Lime, Simpson.
Its lease has reported 37.5K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by O'Neal, Lindell; the EWA schedule now lists a different operator.
Nocona, TX · P-5 Y, filed Apr 4, 2026 · 8 permits on file · (940) 867-1377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | O Neal Oil Company |
| Production reports | O'Neal Oil Companythrough Apr 2026 |
| Latest permit | O'Neal, LindellOct 24, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,800
- total depth, ft
- 1
- permits on file
- Oct 24, 1983
- last permit issued
- Jan 5, 1984
- completed
- 37.5K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 5, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sanders, Jess "C" O-13-23902 | Sanders (Conglomerate, Lo.) | O'Neal Oil Company | 1 | 37.5K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 583 · prior 12 464(+26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1O'Neal, LindellJan 1993 → Jul 1997
- 2O'Neal Oil Co.Aug 1997 → Jul 1998
- 3O'Neal Oil CompanyAug 1998 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 218421-99 | Drill | O'Neal, Lindell | Jan 23, 1984 | Oct 24, 1983 | — | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-23902 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 921 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Twin Lime | 2,072 | -1,151 |
| Simpson | 5,790 | -4,869 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,485 | 6,495 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 227 | 12.25 | 165 S |
| 5.5 | 6,540 | 7.875 | 648 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 14, 1984 | Jan 20, 1984 | — |
| 00 | Jan 26, 1984 | Jan 20, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-32229 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-32229 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33732229, documented in the API reference.