WELL · 42-337-32250 · DISTRICT 9
Redman A #1
Montague County · Montague County Regular field · Injection · Vertical
Redman A #1 (API 42-337-32250) is a well in Montague County operated by BP Petroleum Operations LLC, completed March 1, 1984 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued January 2, 1984, permitted to 3,000 ft.
It was permitted by Poteet Operating CO. and has since transferred to BP Petroleum Operations LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Davenport Lime, Davine Line, Poteet Granite Wash, Strawn.
Its lease has reported 7.26K barrels of oil and 137 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 4.48K barrels injected in the 12 months reported through July 2025.
Operator of record
Permitted by Poteet Operating Co.; the EWA schedule now lists a different operator.
Nocona, TX · P-5 Y, filed Mar 4, 2026 · (940) 210-4794
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP Petroleum Operations LLC |
| Production reports | Eldred Prod and Consulting, LLCthrough Apr 2018 |
| Latest permit | Poteet Operating Co.Jan 2, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Jan 2, 1984
- last permit issued
- Mar 1, 1984
- completed
- 7.26K
- cumulative oil, bbl
- 137
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 1, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Redman "A" O-13-24193 | Montague County Regular | BP Petroleum Operations, LLC | 3 | 7.26K | 137 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Poteet Operating Co.Jan 1993 → Dec 1993
- 2Rocking, R, Drilling & Prod Co.Jun 1994 → Jul 2011
- 3Big Rock Oil LLCAug 2011 → Aug 2012
- 4Eldred Prod and Consulting, LLCMay 2015 → Apr 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 226359-99 | Drill | Poteet Operating Co. | Nov 18, 1983 | Jan 2, 1984 | — | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24193 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Davenport Lime | 1,800 |
| Davine Line | 1,800 |
| Poteet Granite Wash | 2,600 |
| StrawnSTRAWN-DAVENPORT LIME | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,422 | 1,500 | Perforated |
| 2,395 | 2,404 | Perforated |
| 2,401 | 2,404 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 305 | 12.25 | 210 S |
| 8.625 | 2,901 | 12.25 | 210 sx |
| 4.5 | 2,901 | 7.875 | 760 S |
| 4.5 | 2,950 | 7.875 | 760 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 2023 | May 28, 2022 | — |
| 00 | Dec 27, 1995 | Nov 20, 1995 | — |
| 00 | Aug 25, 1986 | Aug 5, 1986 | — |
| 00 | Apr 16, 1985 | Feb 14, 1985 | — |
| 00 | Apr 3, 1985 | Feb 14, 1985 | — |
| 00 | May 8, 1984 | Apr 23, 1984 | — |
| 00 | Apr 28, 1984 | Apr 23, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-32250 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-32250 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4.48K
- bbl, last 12 reported months
- 256K
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000077204 | H-1 Injection | Active | 50 | 550 | 2,396–2,404 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4,475 · prior 12 4,268(+5%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33732250, documented in the API reference.