WELL · 42-337-33364 · DISTRICT 9
Bashe #1
Montague County · Clingingsmith E. (Strawn Up.) field · Vertical
Bashe #1 (API 42-337-33364) is a plugged well in Montague County, plugged September 17, 2012, last operated by Rocanville Corporation.
The RRC has issued one drilling permit, issued October 12, 2000, permitted to 6,350 ft.
It was permitted by H & S Production, Inc. and has since transferred to Rocanville Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Etter Lime, Caddo, Barnett.
Its lease has reported 9.94K barrels of oil since January 2001, last reporting in November 2012.
Operator of record
Permitted by H & S Production, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jul 5, 2013 · 7 permits on file · (874) 270-2879
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rocanville Corporation |
| Production reports | Rocanville Corporationthrough Sep 2010 |
| Latest permit | H & S Production, Inc.Oct 12, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,350
- total depth, ft
- 1
- permits on file
- Oct 12, 2000
- last permit issued
- Jan 16, 2001
- completed
- 9.94K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Nov 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 16, 2001
- Shut in
- —
- Plugged
- Sep 17, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bashe O-13-29862 | Clingingsmith, E. (Strawn, Up.) | Rocanville Corporation | 1 | 9.94K | 0 | Jan 2001 – Nov 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1H & S Production, Inc.Jan 2001 → Mar 2003
- 2Gonzenbach, Glen DApr 2003 → Jun 2007
- 3Rocanville CorporationJan 2008 → Sep 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 500702-99 | Drill | H & S Production, Inc. | Oct 12, 2000 | Oct 12, 2000 | Oct 19, 2000 | 6,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29862 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 932 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,674 | 5,694 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,037 | 12.25 | 310 S |
| 4.5 | 5,865 | 7.875 | 460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 2001 | Jan 29, 2000 | Yes |
| 00 | Mar 19, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-33364 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-33364 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33733364, documented in the API reference.