WELL · 42-337-33383 · DISTRICT 9

Gist I. A. (Barbara) #58

Y

Montague County · Montague County Regular field · Injection  · Vertical

Gist I. A. (Barbara) #58 (API 42-337-33383) is a well in Montague County operated by Peba Oil & Gas Inc., completed March 20, 2001 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued January 10, 2001, permitted to 999 ft.

It was permitted by Peba Oil & Gas CO. and has since transferred to Peba Oil & Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including Cisco.

Its lease has reported 720K barrels of oil and 144 mcf of gas since January 1993, last reporting in July 2026. The lease carries 56 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 341K barrels injected in the 12 months reported through July 2025.

Operator of record

Peba Oil & Gas Inc.

Permitted by Peba Oil & Gas Co.; the EWA schedule now lists a different operator.

Nocona, TX · P-5 Y, filed Dec 4, 2025 · 19 permits on file · (940) 825-4825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePeba Oil & Gas Inc.
Production reportsPeba Oil & Gas, Inc.through Apr 2026
Latest permitPeba Oil & Gas Co.Jan 10, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

999
total depth, ft
1
permits on file
Jan 10, 2001
last permit issued
Mar 20, 2001
completed
720K
cumulative oil, bbl
144
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 20, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 56 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gist, I. A. (Barbara) O-13-4255Montague County RegularPeba Oil & Gas, Inc.56720K144Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 6,775 · prior 12 6,851(-1%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peba Oil & Gas Co.Jan 1993 → Apr 2011
  2. 2Peba Oil & Gas, Inc.May 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
503898-99DrillPeba Oil & Gas Co.Jan 10, 2001Jan 10, 2001Jan 15, 2001999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-4255————

Formation tops

As filed on W-2/G-1. Subsea from 800 ft elevation.Download CSV →

FormationMD ftSubsea
CiscoCISCO SANDS830-30

Perforations

Perforated and open-hole intervals.

FromToType
830840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58897.875235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2003Aug 7, 2003—
00Jun 18, 2001Mar 29, 2001Yes
00Apr 19, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

341K
bbl, last 12 reported months
5.33M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093254H-1 InjectionActive1,000400830–840

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 340,750 · prior 12 341,000(0%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33733383, documented in the API reference.