WELL · 42-337-33513 · DISTRICT 9

Holt Sand Unit #S 18

Plugged

Montague County · Montague County Regular field  · Vertical

Holt Sand Unit #S 18 (API 42-337-33513) is a plugged well in Montague County, plugged July 3, 2014, last operated by Wako Oil CO. LLC.

The RRC has issued one drilling permit, issued November 13, 2002, permitted to 2,000 ft.

It was permitted by Seelye, William L. and has since transferred to Wako Oil CO. LLC on the wellbore schedule.

Completion filings report one formation top, including Deep Canyon.

Its lease has reported 345K barrels of oil and 545 mcf of gas since January 1993, last reporting in July 2026. The lease carries 63 wells, so these are lease totals, not this well alone.

Operator of record

Wako Oil Co. LLC

Permitted by Seelye, William L.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Oct 4, 2025 · (214) 537-2545

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWako Oil Co. LLC
Production reportsWako Oil Co. LLCthrough Apr 2026
Latest permitSeelye, William L.Nov 13, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Nov 13, 2002
last permit issued
Apr 10, 2003
completed
345K
cumulative oil, bbl
545
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 10, 2003
Shut in
—
Plugged
Jul 3, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 63 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holt Sand Unit O-13-12478Montague County RegularWako Oil Co. LLC63345K545Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,989 · prior 12 3,181(+25%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1O-Rrell Oil CompanyJan 1993 → Dec 2001
  2. 2Seelye, William L.Mar 2002 → Feb 2005
  3. 3Seel-Mac Oil & Gas LLCMar 2005 → Nov 2010
  4. 4Brahman Operating, L.L.C.Dec 2010 → Nov 2012
  5. 5Wako Oil Co. LLCDec 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525325-99DrillSeelye, William L.Nov 7, 2002Nov 13, 2002Apr 9, 20032,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-12478————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Deep Canyon1,864

Perforations

Perforated and open-hole intervals.

FromToType
1,8641,904Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.52,0007.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 2012Jul 6, 2012—
00Aug 31, 2005May 31, 2005Yes
00Jun 17, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
72.8K
bbl, all reported
Jul 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105109H-1 InjectionPlugged Aug 7, 20142009301,864–1,904

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 72,751(-100%)

05K10K20132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33733513, documented in the API reference.