WELL · 42-337-33534 · DISTRICT 9
Skinner SWD #1
Montague County · Montague County Regular field · Injection · Vertical
Skinner Swd #1 (API 42-337-33534) is a well in Montague County operated by Skinner Tank Trucks Inc., completed July 17, 2003 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued March 13, 2003, permitted to 4,650 ft.
Completion filings report one formation top, including Strawn.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 82.7K barrels injected in the 12 months reported through July 2025.
Operator of record
Nocona, TX · P-5 Y, filed May 4, 2026 · 2 permits on file · (940) 867-9079
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Skinner Tank Trucks Inc. |
| Production reports | none |
| Latest permit | Skinner Tank Trucks, Inc.Mar 13, 2003 |
- 4,650
- total depth, ft
- 1
- permits on file
- Mar 13, 2003
- last permit issued
- Jul 17, 2003
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 17, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Skinner SWD O-13-30189 | Montague County Regular | Skinner Tank Trucks, Inc. | 2 | 0 | 0 | Aug 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 529425-99 | Drill | Skinner Tank Trucks, Inc. | Mar 10, 2003 | Mar 13, 2003 | Apr 29, 2003 | 4,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30189 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 971 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 4,230 | -3,259 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,230 | 4,492 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,160 | 12.25 | 475 S |
| 5.5 | 4,696 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 2003 | Aug 4, 2003 | — |
| 00 | Sep 4, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-33534 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-33534 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 82.7K
- bbl, last 12 reported months
- 6.35M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093153 | W-14 Disposal | Active | 10,000 | 1,600 | 4,230–4,492 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 82,695 · prior 12 85,947(-4%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33733534, documented in the API reference.