WELL · 42-337-33644 · DISTRICT 9
Skinner SWD #2
Montague County · Montague County Regular field · Injection · Vertical
Skinner Swd #2 (API 42-337-33644) is a well in Montague County operated by Skinner Tank Trucks Inc., completed October 20, 2004 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued August 3, 2004, permitted to 4,600 ft.
Completion filings report one formation top, including Strawns.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 209K barrels injected in the 12 months reported through July 2025.
Operator of record
Nocona, TX · P-5 Y, filed May 4, 2026 · 2 permits on file · (940) 867-9079
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Skinner Tank Trucks Inc. |
| Production reports | none |
| Latest permit | Skinner Tank Trucks, Inc.Aug 3, 2004 |
- 4,600
- total depth, ft
- 1
- permits on file
- Aug 3, 2004
- last permit issued
- Oct 20, 2004
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 20, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Skinner SWD O-13-30189 | Montague County Regular | Skinner Tank Trucks, Inc. | 2 | 0 | 0 | Aug 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 548918-99 | Drill | Skinner Tank Trucks, Inc. | Jul 29, 2004 | Aug 3, 2004 | Sep 23, 2004 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30189 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawns | 2,845 | -2,835 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,845 | 4,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,145 | 13.5 | 700 S |
| 7 | 4,400 | 8.75 | 1,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 2005 | Nov 5, 2004 | — |
| 00 | Nov 10, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-33644 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-33644 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 209K
- bbl, last 12 reported months
- 6.38M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094204 | W-14 Disposal | Active | 15,000 | 1,425 | 2,845–4,550 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 209,146 · prior 12 172,853(+21%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33733644, documented in the API reference.