WELL · 42-337-33679 · DISTRICT 9

Maddox J. W. -C-2- #18

Y

Montague County · Montague County Regular field · Injection  · Vertical

Maddox J. W. -C-2- #18 (API 42-337-33679) is a well in Montague County operated by Peba Oil & Gas Inc., completed September 20, 2009 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued January 31, 2005, permitted to 950 ft.

It was permitted by Peba Oil & Gas CO. and has since transferred to Peba Oil & Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including 900 Sand.

Its lease has reported 124K barrels of oil and 142 mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 66.5K barrels injected in the 12 months reported through July 2025.

Operator of record

Peba Oil & Gas Inc.

Permitted by Peba Oil & Gas Co.; the EWA schedule now lists a different operator.

Nocona, TX · P-5 X, filed Mar 5, 2026 · 19 permits on file · (940) 825-4825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePeba Oil & Gas Inc.
Production reportsPeba Oil & Gas, Inc.through Apr 2026
Latest permitPeba Oil & Gas Co.Jan 31, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

950
total depth, ft
1
permits on file
Jan 31, 2005
last permit issued
Sep 20, 2009
completed
124K
cumulative oil, bbl
142
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 20, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maddox, J. W. -C-2- O-13-4234Montague County RegularPeba Oil & Gas, Inc.18124K142Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 692 · prior 12 844(-18%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Oil Company of CaliforniaJan 1993 → Jun 1994
  2. 2Medallion Production CompanyJul 1994 → Apr 1995
  3. 3Peba Oil & Gas Co.May 1995 → Apr 2011
  4. 4Peba Oil & Gas, Inc.May 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556662-99DrillPeba Oil & Gas Co.Jan 24, 2005Jan 31, 2005Jul 12, 2005950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-4234————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
900 Sand900
900 Sand910

Perforations

Perforated and open-hole intervals.

FromToType
910920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,0337.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 21, 2010Oct 15, 2009—
00Nov 2, 2005Aug 17, 2005Yes
00Aug 31, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

66.5K
bbl, last 12 reported months
991K
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099784H-1 InjectionActive200448900–930

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 66,480 · prior 12 68,200(-3%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33733679, documented in the API reference.