WELL · 42-337-33944 · DISTRICT 9
Nielsen #2
Montague County · Vertical
Nielsen #2 (API 42-337-33944) is a permitted well in Montague County filed by Joint Resources Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2007 and 2015, permitted to 8,955 ft.
Completion filings report 4 formation tops, including Atoka, Marble Falls, Comyn, Barnett.
Operator of record
Fort Worth, TX · P-5 Y, filed Dec 4, 2025 · 241 permits on file · (817) 946-1158
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Joint Resources Companythrough Dec 2020 |
| Latest permit | Joint Resources CompanyOct 19, 2015 |
- 8,955
- total depth, ft
- 2
- permits on file
- Oct 19, 2015
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 285K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nielsen G-13-276755 | Newark, East (Barnett Shale) | Joint Resources Company | 1 | 0 | 285K | Nov 2007 – Jul 2026 |
| Nielsen O-13-31038 | Newark, East (Barnett Shale) | EOG Resources, Inc. | 2 | 0 | 0 | Nov 2007 – Jun 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Nov 2007 → May 2015
- 2Joint Resources CompanyJun 2015 → Dec 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 811054-99 | Recompletion | Joint Resources Company | Oct 9, 2015 | Oct 19, 2015 | — | 7,500 |
| 645035-99 | Drill | Joint Resources Company | Aug 24, 2007 | Aug 29, 2007 | Sep 27, 2007 | 8,955 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-276755 | — | — | — | — |
| — | — O-13-31038 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 863 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Atoka | 6,438 | -5,575 |
| Marble Falls | 6,904 | -6,041 |
| Comyn | 7,077 | -6,214 |
| BarnettUPPER BARNETT SHALE | 7,368 | -6,505 |
| BarnettBARNETT SAHLE | 7,822 | -6,959 |
| BarnettLOWER BARNETT SHALE | 7,822 | -6,959 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,551 | 7,587 | Perforated |
| 7,692 | 7,802 | Perforated |
| 7,930 | 8,065 | Perforated |
| 8,122 | 8,224 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 747 | 12.25 | 425 S |
| 8.625 | 7,479 | 12.25 | 425 S |
| 5.5 | 8,290 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 1, 2015 | Jul 1, 2014 | — |
| 00 | Oct 23, 2008 | Apr 1, 2008 | Yes |
| 00 | Oct 17, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-33944 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-33944 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33733944, documented in the API reference.