WELL · 42-337-34651 · DISTRICT 9
Martin (SA) #3H
Montague County · Newark East (Barnett Shale) field · Horizontal
Martin (SA) #3H (API 42-337-34651) is a horizontal well in Montague County operated by U.S. Energy Development Corp, completed October 6, 2011.
The RRC has issued one drilling permit, issued June 24, 2011, permitted to 12,950 ft.
It was permitted by Wbh Energy Partners LLC and has since transferred to U.S. Energy Development Corp on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Up Barnett.
Its 2 leases have reported 78.2K barrels of oil and 1.21M mcf of gas since August 2011, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by WBH Energy Partners LLC; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jan 5, 2026 · 225 permits on file · (800) 357-9165
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | U.S. Energy Development Corp |
| Production reports | Eagleridge Operating, LLCthrough Apr 2026 |
| Latest permit | WBH Energy Partners LLCJun 24, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,950
- total depth, ft
- 1
- permits on file
- Jun 24, 2011
- last permit issued
- Oct 6, 2011
- completed
- 78.2K
- cumulative oil, bbl
- 1.21M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 6, 2011
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Martin (SA) G-13-272547 | Newark, East (Barnett Shale) | Eagleridge Operating, LLC | 1 | 0 | 723K | Dec 2011 – Jul 2026 |
| Martin (SA) O-13-32044 | Newark, East (Barnett Shale) | U.S. Energy Development Corp | 3 | 78.2K | 491K | Aug 2011 – Oct 2015 |
Gas, mcf lease total
Last 12 months 23,191 · prior 12 25,306(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1WBH Energy Partners LLCDec 2011 → Feb 2015
- 2U.S. Energy Development CorpMar 2015 → Oct 2017
- 3Eagleridge Operating, LLCNov 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 719109-99 | Drill | WBH Energy Partners LLC | Jun 24, 2011 | Jun 24, 2011 | Jul 8, 2011 | 12,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-272547 | — | — | — | — |
| — | — O-13-32044 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,036 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 6,582 | -5,546 |
| Marble Falls | 6,940 | -5,904 |
| UP Barnett | 7,557 | -6,521 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,571 | 8,721 | Perforated |
| 8,571 | 13,265 | Perforated |
| 8,811 | 8,961 | Perforated |
| 9,051 | 9,201 | Perforated |
| 9,291 | 9,441 | Perforated |
| 9,531 | 9,681 | Perforated |
| 9,771 | 9,921 | Perforated |
| 10,011 | 10,161 | Perforated |
| 10,251 | 10,401 | Perforated |
| 10,491 | 10,641 | Perforated |
| 10,731 | 10,881 | Perforated |
| 11,211 | 11,361 | Perforated |
| 11,451 | 11,601 | Perforated |
| 11,691 | 11,841 | Perforated |
| 11,931 | 12,171 | Perforated |
| 12,171 | 12,351 | Perforated |
| 12,410 | 12,575 | Perforated |
| 12,625 | 12,805 | Perforated |
| 12,855 | 13,005 | Perforated |
| 13,105 | 13,265 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 922 | 12.25 | 368 S |
| 5.5 | 13,300 | 8.75 | 1,180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 16, 2015 | — | — |
| 00 | Jun 27, 2014 | Sep 13, 2013 | — |
| 00 | Nov 14, 2012 | Apr 16, 2012 | — |
| 00 | Jun 11, 2012 | Nov 15, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-34651 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-34651 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.