WELL · 42-337-34875 · DISTRICT 9
Beloate Unit #1H
Montague County · Newark East (Barnett Shale) field · Horizontal
Beloate Unit #1H (API 42-337-34875) is a plugged horizontal well in Montague County, plugged October 6, 2015, last operated by Fuse Energy LLC.
The RRC has issued one drilling permit (amended twice), issued June 1, 2012, permitted to 9,000 ft.
It was permitted by Pioneer Natural Res. USA, Inc. and has since transferred to Fuse Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Barnett.
Operator of record
Permitted by Pioneer Natural Res. USA, Inc.; the EWA schedule now lists a different operator.
Alvord, TX · P-5 Y, filed May 3, 2019 · 4 permits on file · (303) 809-3622
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fuse Energy LLC |
| Production reports | Pioneer Natural Res. USA, Inc.through Feb 2013 |
| Latest permit | Pioneer Natural Res. USA, Inc.Jun 1, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 3
- permits on file
- Jun 1, 2012
- last permit issued
- Oct 3, 2012
- completed
- 0
- cumulative oil, bbl
- 2.08K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2012 THROUGH Oct 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 3, 2012
- Shut in
- —
- Plugged
- Oct 6, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beloate Unit G-13-267847 | Newark, East (Barnett Shale) | Fuse Energy, LLC | 1 | 0 | 2.08K | Sep 2012 – Oct 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pioneer Natural Res. USA, Inc.Oct 2012 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 741470-97 | Drill | Pioneer Natural Res. USA, Inc. | Jun 26, 2012 | Jun 1, 2012 | Jul 2, 2012 | 9,000 |
| 741470-98 | Drill | Pioneer Natural Res. USA, Inc. | Jun 18, 2012 | Jun 1, 2012 | Jul 2, 2012 | 9,000 |
| 741470-99 | Drill | Pioneer Natural Res. USA, Inc. | May 25, 2012 | Jun 1, 2012 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-267847 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 927 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 5,647 | -4,720 |
| Marble Falls | 6,003 | -5,076 |
| Barnett | 6,415 | -5,488 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,525 | 13,728 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,220 | 12.25 | 505 S |
| 5.5 | 13,795 | 8.75 | 894 S |
| 5.5 | — | 8.75 | 278 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 20, 2014 | Jan 28, 2014 | — |
| 00 | May 24, 2013 | Oct 17, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-34875 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-34875 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33734875, documented in the API reference.