WELL · 42-337-82936 · DISTRICT 13

McGaughy, H. C. #3A

N

Montague County  · Vertical

Mcgaughy, H. C. #3A (API 42-337-82936) is a former disposal or injection well in Montague County, last operated by Thomas, M.A. Oil Associates; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 1,850 ft.

Operator of record

Thomas, M.A. Oil Associates

Nocona, TX · P-5 Inactive, filed Nov 5, 1997 · 69 permits on file · (940) 825-4541

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitThomas, M.A. Oil AssociatesJul 15, 1985
1,850
total depth, ft
2
permits on file
Jul 15, 1985
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
280219-99OtherThomas, M.A. Oil AssociatesJul 12, 1985Jul 15, 1985—1,200
155906-99OtherThomas, M.A. Oil AssociatesApr 7, 1982Apr 7, 1982—1,850

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
61K
bbl, all reported
Jul 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000048888W-14 DisposalPlugged Aug 21, 20001,000700950–1,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33782936, documented in the API reference.