WELL · 42-339-30679 · DISTRICT 3
Frost #1
Montgomery County · Directional
Frost #1 (API 42-339-30679) is a plugged well in Montgomery County, plugged September 22, 1984, last operated by Galloway Energy CO..
The RRC has issued 4 drilling permits between 1984 and 2005, permitted to 6,500 ft.
Completion filings report 2 formation tops, including Jackson, Yegua.
It holds an active disposal or injection permit, with 4 barrels injected in the 12 months reported through December 2025.
Operator of record
Tomball, TX · P-5 Y, filed Sep 4, 2025 · 11 permits on file · (281) 356-9589
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Galloway Energy Co.Apr 26, 2005 |
- 6,500
- total depth, ft
- 4
- permits on file
- Apr 26, 2005
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 22, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Frost G-3-255086 | Pinehurst, SW. (Yegua) | Galloway Energy Co. | 1 | 0 | 0 | Mar 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 561045-99 | Reenter | Galloway Energy Co. | Apr 25, 2005 | Apr 26, 2005 | Jun 18, 2001 | 2,868 |
| 510086-99 | Reenter | Galloway Energy Co. | Jun 11, 2001 | Jun 12, 2001 | — | 4,000 |
| 468670-99 | Reenter | Galloway Energy Co. | Oct 10, 1997 | Oct 10, 1997 | — | 6,500 |
| 250105-99 | Drill | NM-Yates Pet. | Aug 30, 1984 | Aug 30, 1984 | Sep 9, 1984 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-255086 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 209 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,762 | 2,772 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,922 | 12.25 | 685 S |
| 5.5 | 2,868 | 7.875 | 135 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 5, 2013 | Jan 2, 2013 | — |
| 00 | Jul 7, 2010 | Oct 10, 2003 | — |
| 00 | Mar 22, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-339-30679 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-339-30679 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4
- bbl, last 12 reported months
- 442
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093483 | W-14 Disposal | Active | 700 | 500 | 2,762–2,772 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4 · prior 12 11(-64%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33930679, documented in the API reference.