WELL · 42-339-30688 · DISTRICT 3

Woods J. W. #6A

Plugged

Montgomery County · Willis West field  · Vertical

Woods J. W. #6A (API 42-339-30688) is a plugged well in Montgomery County, plugged June 10, 1997, last operated by Bellwether Exploration Company.

The RRC has issued one drilling permit, issued November 26, 1984, permitted to 4,000 ft.

It was permitted by Nelson, Harry E. and has since transferred to Bellwether Exploration Company on the wellbore schedule.

Completion filings report one formation top, including Yegua.

Operator of record

Bellwether Exploration Company

Permitted by Nelson, Harry E.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 11, 2002 · 61 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBellwether Exploration Company
Production reportsHampton Resources Corporationthrough Aug 1994
Latest permitNelson, Harry E.Nov 26, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Nov 26, 1984
last permit issued
Aug 6, 1990
completed
0
cumulative oil, bbl
5.77K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 6, 1990
Shut in
—
Plugged
Jun 10, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Woods, J. W. G-3-135795Willis, WestBellwether Exploration Company105.77KJan 1993 – Jun 1997
— O-3-20737——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thornberry Oilfield Service, IncJan 1993 → Jul 1994
  2. 2Hampton Resources CorporationAug 1994 → Aug 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
258853-99DrillNelson, Harry E.Nov 26, 1984Nov 26, 1984—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-135795————
—— O-3-20737————

Formation tops

As filed on W-2/G-1. Subsea from 240 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua3,650-3,410

Perforations

Perforated and open-hole intervals.

FromToType
3,7043,718Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7533514.75220 S
73,64011695 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 2, 1991Sep 20, 1990Yes
00Oct 16, 1990——
00Jul 31, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33930688, documented in the API reference.