WELL · 42-339-30713 · DISTRICT 3

Kuntz, T. E. #1

Plugged

Montgomery County  · Vertical

Kuntz, T. E. #1 (API 42-339-30713) is a plugged well in Montgomery County, plugged May 21, 1985, last operated by Galloway Energy CO..

The RRC has issued 2 drilling permits (amended once) between 1985 and 2003, permitted to 11,550 ft.

Operator of record

Galloway Energy Co.

Tomball, TX · P-5 Y, filed Sep 4, 2025 · 11 permits on file · (281) 356-9589

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGalloway Energy Co.Apr 25, 2003
11,550
total depth, ft
3
permits on file
Apr 25, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 21, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
531065-98ReenterGalloway Energy Co.Aug 22, 2003Apr 25, 2003—11,550
531065-99ReenterGalloway Energy Co.Apr 24, 2003Apr 25, 2003—2,620
271996-99DrillApd CompanyApr 8, 1985Apr 9, 1985—11,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.