WELL · 42-341-30591 · DISTRICT 10

Sneed -3- #3-9

N

Moore County · Panhandle (Red Cave) field  · Vertical

Sneed -3- #3-9 (API 42-341-30591) is a well in Moore County operated by Leejan Oil Company, completed May 24, 1980.

The RRC has issued one drilling permit, issued April 25, 1980, permitted to 2,200 ft.

It was permitted by Maynard Oil CO. and has since transferred to Leejan Oil Company on the wellbore schedule.

Its lease has reported 80.9K barrels of oil and 217K mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Leejan Oil Company

Permitted by Maynard Oil Co.; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Sep 4, 2025 · 2 permits on file · (806) 678-3001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLeejan Oil Company
Production reportsSNW Operating Companythrough Apr 2026
Latest permitMaynard Oil Co.Apr 25, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Apr 25, 1980
last permit issued
May 24, 1980
completed
80.9K
cumulative oil, bbl
217K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 24, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sneed -Mr- O-14-4632Panhandle (Red Cave)SNW Operating Company1380.9K217KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 855 · prior 12 0

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Leejan Oil CompanyJan 1993 → Aug 2012
  2. 2Quest-Tex Energy Operating, LLCSep 2012 → Nov 2013
  3. 3New-Tex Operating, LLCDec 2013 → Jun 2015
  4. 4Adams Affiliates, Inc.Jul 2015 → Dec 2018
  5. 5Polaris Operating, LLCJan 2019 → Dec 2023
  6. 6SNW Operating CompanyAug 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
79252-99DrillMaynard Oil Co.Apr 25, 1980Apr 25, 1980May 6, 19802,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-4632————

Perforations

Perforated and open-hole intervals.

FromToType
1,7762,007Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62553212.25250 S
2.3751,994——
4.52,1507.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 1986Jun 12, 1980—
00Jun 11, 1986Jun 12, 1980—
00Jun 7, 1986——
00Jan 12, 1984Jun 12, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34130591, documented in the API reference.