WELL · 42-341-30636 · DISTRICT 10

Brent #6604

Plugged

Moore County · Panhandle Moore County Field field  · Vertical

Brent #6604 (API 42-341-30636) is a plugged well in Moore County, plugged April 9, 1993, last operated by Richmond Petroleum Inc..

The RRC has issued 2 drilling permits between 1980 and 1991, permitted to 3,750 ft.

Completion filings report one formation top, including Red Cave.

Operator of record

Richmond Petroleum Inc.

Amarillo, TX · P-5 Y, filed Mar 22, 2001 · 115 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRichmond Petroleum Inc.
Production reportsnone
Latest permitRichmond Petroleum Inc.Mar 6, 1991
3,750
total depth, ft
2
permits on file
Mar 6, 1991
last permit issued
Nov 10, 1981
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 10, 1981
Shut in
—
Plugged
Apr 9, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 104 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brent O-14-5075Panhandle Moore County FieldRichmond Petroleum Inc.9300Jan 1993 – Aug 2003
Brent O-14-6761Panhandle (Red Cave)Richmond Petroleum Inc.1100Jan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
385202-99RecompletionRichmond Petroleum Inc.Feb 28, 1991Mar 6, 1991Feb 16, 19912,480
98121-99DrillHufo OilsNov 6, 1980Nov 6, 1980Aug 27, 19813,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5075————
—— O-14-6761————

Formation tops

As filed on W-2/G-1. Subsea from 3,453 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,9001,553

Perforations

Perforated and open-hole intervals.

FromToType
2,0602,220Perforated
3,4803,680Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51412.25690 S
4.52,5817.875175 S
2.3753,650——
4.53,6807.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 1991Apr 12, 1991Yes
00Jun 10, 1991——
00Jan 12, 1984Jun 22, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34130636, documented in the API reference.