WELL · 42-341-30657 · DISTRICT 10
Brent #6101
Moore County · Panhandle Moore County Field field · Vertical
Brent #6101 (API 42-341-30657) is a plugged well in Moore County, plugged November 21, 1995, last operated by Richmond Petroleum Inc..
The RRC has issued 2 drilling permits between 1981 and 1991, permitted to 3,650 ft.
Completion filings report 4 formation tops, including Red Cave, Brown Dolomite, Arkosic & Moore, Granite.
Operator of record
Amarillo, TX · P-5 Y, filed Mar 22, 2001 · 115 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richmond Petroleum Inc. |
| Production reports | none |
| Latest permit | Richmond Petroleum Inc.May 28, 1991 |
- 3,650
- total depth, ft
- 2
- permits on file
- May 28, 1991
- last permit issued
- Feb 24, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 24, 1982
- Shut in
- —
- Plugged
- Nov 21, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 104 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brent O-14-5075 | Panhandle Moore County Field | Richmond Petroleum Inc. | 93 | 0 | 0 | Jan 1993 – Aug 2003 |
| Brent O-14-6761 | Panhandle (Red Cave) | Richmond Petroleum Inc. | 11 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 388101-99 | Recompletion | Richmond Petroleum Inc. | May 20, 1991 | May 28, 1991 | Jun 13, 1991 | 2,500 |
| 107108-99 | Drill | Hufo Oils | Jan 30, 1981 | Jan 30, 1981 | Oct 4, 1981 | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5075 | — | — | — | — |
| — | — O-14-6761 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,508 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,950 | 1,558 |
| Brown Dolomite | 2,610 | 898 |
| Arkosic & Moore | 2,760 | 748 |
| Granite | 3,350 | 158 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,068 | 2,074 | Perforated |
| 2,080 | 2,086 | Perforated |
| 2,127 | 2,134 | Perforated |
| 2,136 | 2,142 | Perforated |
| 2,144 | 2,160 | Perforated |
| 2,164 | 2,172 | Perforated |
| 2,176 | 2,182 | Perforated |
| 2,208 | 2,214 | Perforated |
| 2,226 | 2,234 | Perforated |
| 2,246 | 2,248 | Perforated |
| 3,350 | 3,550 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,516 | 12.25 | 690 S |
| 2.375 | 3,500 | — | — |
| 4.5 | 3,550 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 9, 1991 | Jul 12, 1991 | Yes |
| 00 | Oct 8, 1991 | Aug 16, 1982 | — |
| 00 | Jan 12, 1984 | Aug 16, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-30657 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-30657 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34130657, documented in the API reference.