WELL · 42-341-30768 · DISTRICT 10
Brent #6002
Moore County · Panhandle Moore County Field field · Vertical
Brent #6002 (API 42-341-30768) is a plugged well in Moore County, plugged December 10, 1993, last operated by Richmond Petroleum Inc..
The RRC has issued 2 drilling permits between 1981 and 1990, permitted to 3,750 ft.
Completion filings report 5 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite, Moore County Lime.
Operator of record
Amarillo, TX · P-5 Y, filed Mar 22, 2001 · 115 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richmond Petroleum Inc. |
| Production reports | none |
| Latest permit | Richmond Petroleum Inc.Oct 24, 1990 |
- 3,750
- total depth, ft
- 2
- permits on file
- Oct 24, 1990
- last permit issued
- Apr 15, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 15, 1982
- Shut in
- —
- Plugged
- Dec 10, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 104 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brent O-14-5075 | Panhandle Moore County Field | Richmond Petroleum Inc. | 93 | 0 | 0 | Jan 1993 – Aug 2003 |
| Brent O-14-6761 | Panhandle (Red Cave) | Richmond Petroleum Inc. | 11 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 379729-99 | Recompletion | Richmond Petroleum Inc. | Oct 18, 1990 | Oct 24, 1990 | Oct 9, 1990 | 2,210 |
| 144036-99 | Drill | Hufo Oils | Dec 14, 1981 | Dec 14, 1981 | — | 3,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5075 | — | — | — | — |
| — | — O-14-6761 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,570 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,983 | 1,587 |
| Panhandle Lime | 2,432 | 1,138 |
| Brown Dolomite | 2,712 | 858 |
| Moore County Lime | 3,216 | 354 |
| Granite Wash | 4,449 | -879 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,027 | 2,031 | Perforated |
| 2,038 | 2,048 | Perforated |
| 2,072 | 2,090 | Perforated |
| 2,120 | 2,124 | Perforated |
| 2,145 | 2,149 | Perforated |
| 2,160 | 2,163 | Perforated |
| 2,189 | 2,197 | Perforated |
| 3,430 | 3,820 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,524 | 12.25 | 690 S |
| 4.5 | 3,814 | 7.875 | 450 S |
| 2.375 | 3,820 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1991 | Mar 6, 1991 | Yes |
| 00 | Jun 10, 1991 | — | — |
| 00 | Jan 12, 1984 | Jun 1, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-30768 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-30768 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34130768, documented in the API reference.