WELL · 42-341-31177 · DISTRICT 10

Rogers #2

N

Moore County · Panhandle Moore County Field field  · Vertical

Rogers #2 (API 42-341-31177) is a well in Moore County operated by Gape Oil & Gas Company, completed November 22, 1985.

The RRC has issued one drilling permit, issued December 15, 1983, permitted to 3,700 ft.

It was permitted by Tex-Well Oil & Gas Corp. and has since transferred to Gape Oil & Gas Company on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, White Dolomite, Moore County Lime.

Its lease has reported 49.3K barrels of oil and 1.36M mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Gape Oil & Gas Company

Permitted by Tex-Well Oil & Gas Corp.; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Oct 14, 1988 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGape Oil & Gas Company
Production reportsLarge Operating LLCthrough Apr 2026
Latest permitTex-Well Oil & Gas Corp.Dec 15, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,700
total depth, ft
1
permits on file
Dec 15, 1983
last permit issued
Nov 22, 1985
completed
49.3K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 22, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seth O-14-5731Panhandle Moore County FieldLarge Operating LLC649.3K1.36MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 3,132 · prior 12 1,077(+191%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 42 · prior 12 18(+133%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1T & R Investments, Inc.Jan 1993 → Aug 1994
  2. 2Alliance Resources CorporationSep 1994 → Dec 2000
  3. 3L & G Operating, Inc.Jan 2001 → Aug 2021
  4. 4Large Operating LLCSep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
223817-99DrillTex-Well Oil & Gas Corp.Dec 12, 1983Dec 15, 1983Jan 4, 19843,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5731————

Formation tops

As filed on W-2/G-1. Subsea from 3,432 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,687745
White Dolomite2,927505
Moore County Lime3,018414

Perforations

Perforated and open-hole intervals.

FromToType
2,6703,354Perforated
3,0783,500Perforated
3,1643,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,50913.75350 S
5.53,4297.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 1990Jun 7, 1990—
00Feb 10, 1988Jan 14, 1986—
00Feb 3, 1988——
00Jan 27, 1986Jan 14, 1986—
00May 16, 1984May 1, 1984—
00May 11, 1984May 1, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34131177, documented in the API reference.