WELL · 42-341-31319 · DISTRICT 10
Brandi #1
Moore County · Panhandle Moore County Field field · Vertical
Brandi #1 (API 42-341-31319) is a plugged well in Moore County, plugged February 23, 2020, last operated by Fortay Inc..
The RRC has issued one drilling permit, issued June 29, 1984, permitted to 3,700 ft.
It was permitted by Taylorcrest Inc. and has since transferred to Fortay Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Panhandle, Brown Dolomite, Moore County Lime.
Its lease has reported 9.31K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2020.
Operator of record
Permitted by Taylorcrest Inc.; the EWA schedule now lists a different operator.
Sunray, TX · P-5 Y, filed Jan 4, 2026 · 59 permits on file · (806) 930-4533
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fortay Inc. |
| Production reports | Fortay, Inc.through Dec 2016 |
| Latest permit | Taylorcrest Inc.Jun 29, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Jun 29, 1984
- last permit issued
- Aug 20, 1984
- completed
- 9.31K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 20, 1984
- Shut in
- —
- Plugged
- Feb 23, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brandi O-14-6343 | Panhandle Moore County Field | Fortay, Inc. | 1 | 9.31K | 21 | Jan 1993 – Jul 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Taylorcrest Inc.Jan 1993 → Jun 2002
- 2Taylor, Gordon Oil Company, LPJul 2002 → Feb 2014
- 3Fortay, Inc.Mar 2014 → Dec 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 243619-99 | Drill | Taylorcrest Inc. | Jun 29, 1984 | Jun 29, 1984 | Jul 2, 1984 | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-6343 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,575 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Panhandle | 2,510 | 1,065 |
| Brown Dolomite | 2,800 | 775 |
| Moore County Lime | 3,050 | 525 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,667 | 3,669 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,578 | 12.25 | 640 S |
| 5.5 | 3,749 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 1986 | Jul 23, 1986 | Yes |
| 00 | Aug 23, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-31319 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-31319 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34131319, documented in the API reference.