WELL · 42-341-31365 · DISTRICT 10
Norma #1
Moore County · Panhandle Moore County Field field · Vertical
Norma #1 (API 42-341-31365) is a plugged well in Moore County, plugged May 26, 1998, last operated by Revelation Oil & Gas LLC.
The RRC has issued one drilling permit, issued July 31, 1984, permitted to 3,800 ft.
It was permitted by Tex-Well Oil & Gas Corp. and has since transferred to Revelation Oil & Gas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Brown Dolomite, White Dolomite, Moore County Lime.
Its lease has reported 893 barrels of oil and 87.6K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Tex-Well Oil & Gas Corp.; the EWA schedule now lists a different operator.
Dumas, TX · P-5 Y, filed Jul 4, 2026 · (866) 376-1225
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Revelation Oil & Gas LLC |
| Production reports | Revelation Oil & Gas LLCthrough Oct 2010 |
| Latest permit | Tex-Well Oil & Gas Corp.Jul 31, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Jul 31, 1984
- last permit issued
- Oct 11, 1984
- completed
- 893
- cumulative oil, bbl
- 87.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 11, 1984
- Shut in
- —
- Plugged
- May 26, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Norma O-14-5910 | Panhandle Moore County Field | Revelation Oil & Gas LLC | 2 | 893 | 87.6K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1KNG ProducersOct 1997 → Nov 2006
- 2Revelation Oil & Gas LLCNov 2009 → Oct 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 246911-99 | Drill | Tex-Well Oil & Gas Corp. | Jul 30, 1984 | Jul 31, 1984 | Aug 19, 1984 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5910 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,584 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,810 | 774 |
| White Dolomite | 3,055 | 529 |
| Moore County Lime | 3,106 | 478 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,826 | 3,520 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,624 | 12.25 | 550 S |
| 5.5 | 3,589 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 30, 1984 | Oct 12, 1984 | — |
| 00 | Oct 19, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-31365 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-31365 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34131365, documented in the API reference.