WELL · 42-341-31848 · DISTRICT 10

Masterson Red Cave #G76

Y

Moore County · Panhandle (Red Cave) field · Producing  · Vertical

Masterson Red Cave #G76 (API 42-341-31848) is a well in Moore County operated by Snw Operating Company, completed January 23, 1986 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 16, 1985, permitted to 2,200 ft.

It was permitted by Itr Petroleum, Inc. and has since transferred to Snw Operating Company on the wellbore schedule.

Completion filings report one formation top, including Red Cave.

Its lease has reported 1.06M barrels of oil and 3.46M mcf of gas since January 1993, last reporting in July 2026. The lease carries 124 wells, so these are lease totals, not this well alone.

Operator of record

SNW Operating Company

Permitted by Itr Petroleum, Inc.; the EWA schedule now lists a different operator.

Borger, TX · P-5 Y, filed Dec 4, 2025 · 42 permits on file · (806) 886-8331

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSNW Operating Company
Production reportsSNW Operating Companythrough Apr 2026
Latest permitItr Petroleum, Inc.Oct 16, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Oct 16, 1985
last permit issued
Jan 23, 1986
completed
1.06M
cumulative oil, bbl
3.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 23, 1986
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 124 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Masterson Red Cave O-14-3839Panhandle (Red Cave)SNW Operating Company1241.06M3.46MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 11,651 · prior 12 1,996(+484%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Continental Natural Gas, Inc.Jan 1993 → Jan 1993
  2. 2Adams Energy Co. (TX)Feb 1993 → Oct 1998
  3. 3Bird Creek Resources, Inc.Nov 1998 → Apr 2006
  4. 4Adams Affiliates, Inc.May 2006 → Dec 2018
  5. 5Polaris Operating, LLCJan 2019 → Feb 2024
  6. 6SNW Operating CompanyFeb 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
287577-99DrillItr Petroleum, Inc.Oct 16, 1985Oct 16, 1985—2,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-3839————

Formation tops

As filed on W-2/G-1. Subsea from 3,519 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,8441,675

Perforations

Perforated and open-hole intervals.

FromToType
1,8702,099Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
71,2859.875350 S
4.52,1566.25150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 22, 1987Oct 7, 1987Yes
00Oct 21, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34131848, documented in the API reference.